Determining preferred substation configurations based on reliability and cost

Many different substation configurations exist, each with its own space requirements, reliability and cost. Distribution planners need to choose between these numerous layouts and suggest the preferred substation configuration for future networks, but often don't understand the advantages and t...

Full description

Bibliographic Details
Main Author: Van der Merwe, Johanette
Other Authors: Gaunt, C Trevor
Format: Doctoral Thesis
Language:English
Published: University of Cape Town 2016
Subjects:
Online Access:http://hdl.handle.net/11427/20914
id ndltd-netd.ac.za-oai-union.ndltd.org-uct-oai-localhost-11427-20914
record_format oai_dc
spelling ndltd-netd.ac.za-oai-union.ndltd.org-uct-oai-localhost-11427-209142020-12-10T05:11:02Z Determining preferred substation configurations based on reliability and cost Van der Merwe, Johanette Gaunt, C Trevor Electrical Engineering Many different substation configurations exist, each with its own space requirements, reliability and cost. Distribution planners need to choose between these numerous layouts and suggest the preferred substation configuration for future networks, but often don't understand the advantages and total life cycle cost associated with each. The aim of this research is to identify a simplified approach that can be used to determine a set of preferred substation configurations that minimises the total life cycle cost of the substation. An analytical approach is considered which uses deterministic reliability assessment to determine the load-based and economic performance indicators for different substation layouts. This analytical approach builds on the simplified reliability estimation approach developed by Van der Merwe (2014). This simplified approach is sufficiently complex to ensure that errors are not one-sided, while at the same time minimising the number of calculations of the reliability evaluation. A cost estimation tool was developed to determine the utility cost for each of the substations. The purpose of this tool is to prepare preliminary estimates of substation life cycle costs during the planning stage, based on conceptual design information. The value based reliability planning approach (VBRP) is used to determine the substation configuration with the lowest life cycle cost, given the specified design criteria. This substation is then the optimal configuration for the specific design criteria. The research considers 432 different substation configurations, and 720 different design criteria. This results in 311 040 different substation layouts. The approach was programmed into an MS Excel model and this model was used to compare the 432 different substation configurations for each of the 720 different design criteria and 18 different customer damage functions, i.e. repeating the comparison of the 432 different substations 12 960 times. The time required to perform one comparison of the 432 different substation configurations for one given design criteria and customer damage function is approximately 2 seconds. The process was automated and the time required to run through all the design criteria and customer damage functions was 8 hours 46 minutes on a standard laptop with an i5 processor. The optimal substation configuration obtained for each of the 12 960 scenarios were analysed and clustered in order to derive the preferred set of substation configurations. Through this process the 432 different substation configurations were reduced to only 17 different substation configurations. 2016-07-28T11:09:55Z 2016-07-28T11:09:55Z 2016 Doctoral Thesis Doctoral PhD http://hdl.handle.net/11427/20914 eng application/pdf University of Cape Town Faculty of Engineering and the Built Environment Department of Electrical Engineering
collection NDLTD
language English
format Doctoral Thesis
sources NDLTD
topic Electrical Engineering
spellingShingle Electrical Engineering
Van der Merwe, Johanette
Determining preferred substation configurations based on reliability and cost
description Many different substation configurations exist, each with its own space requirements, reliability and cost. Distribution planners need to choose between these numerous layouts and suggest the preferred substation configuration for future networks, but often don't understand the advantages and total life cycle cost associated with each. The aim of this research is to identify a simplified approach that can be used to determine a set of preferred substation configurations that minimises the total life cycle cost of the substation. An analytical approach is considered which uses deterministic reliability assessment to determine the load-based and economic performance indicators for different substation layouts. This analytical approach builds on the simplified reliability estimation approach developed by Van der Merwe (2014). This simplified approach is sufficiently complex to ensure that errors are not one-sided, while at the same time minimising the number of calculations of the reliability evaluation. A cost estimation tool was developed to determine the utility cost for each of the substations. The purpose of this tool is to prepare preliminary estimates of substation life cycle costs during the planning stage, based on conceptual design information. The value based reliability planning approach (VBRP) is used to determine the substation configuration with the lowest life cycle cost, given the specified design criteria. This substation is then the optimal configuration for the specific design criteria. The research considers 432 different substation configurations, and 720 different design criteria. This results in 311 040 different substation layouts. The approach was programmed into an MS Excel model and this model was used to compare the 432 different substation configurations for each of the 720 different design criteria and 18 different customer damage functions, i.e. repeating the comparison of the 432 different substations 12 960 times. The time required to perform one comparison of the 432 different substation configurations for one given design criteria and customer damage function is approximately 2 seconds. The process was automated and the time required to run through all the design criteria and customer damage functions was 8 hours 46 minutes on a standard laptop with an i5 processor. The optimal substation configuration obtained for each of the 12 960 scenarios were analysed and clustered in order to derive the preferred set of substation configurations. Through this process the 432 different substation configurations were reduced to only 17 different substation configurations.
author2 Gaunt, C Trevor
author_facet Gaunt, C Trevor
Van der Merwe, Johanette
author Van der Merwe, Johanette
author_sort Van der Merwe, Johanette
title Determining preferred substation configurations based on reliability and cost
title_short Determining preferred substation configurations based on reliability and cost
title_full Determining preferred substation configurations based on reliability and cost
title_fullStr Determining preferred substation configurations based on reliability and cost
title_full_unstemmed Determining preferred substation configurations based on reliability and cost
title_sort determining preferred substation configurations based on reliability and cost
publisher University of Cape Town
publishDate 2016
url http://hdl.handle.net/11427/20914
work_keys_str_mv AT vandermerwejohanette determiningpreferredsubstationconfigurationsbasedonreliabilityandcost
_version_ 1719369059035774976