The development of a forecasting method for mining house capital projects
Bibliography: pages 95-103. === A broad description of a project is a single, non-repetitive enterprise which is undertaken to achieve planned results within a time limit and a cost budget. This description could equally well apply to fixing a punctured tyre, expanding an existing mine, the design o...
Main Author: | Michalakis, George |
---|---|
Other Authors: | Jervis, W |
Format: | Dissertation |
Language: | English |
Published: |
University of Cape Town
2016
|
Subjects: | |
Online Access: | http://hdl.handle.net/11427/17240 |
Similar Items
-
Development of a predictne framework to forecast venous stenosis
by: Akherat, S. M. Javid Mahmoudzadeh
Published: (2017) -
Timber tower : a flexible fabrication method for reconfigurable housing
by: Coleman, James (James Richard)
Published: (2014) -
Surface modification in air with a scanning tunneling microscope developed in-house
by: Pahng, Jason Yongjun
Published: (2007) -
Exploring Methods for Further Development of Projects in a Cluster Initiative Context : Bridging the commercial handover gap
by: Alipanah, Ario, et al.
Published: (2018) -
Investigation of methods for compensating for setting problems of tapered roller bearings in dimensionally unstable bearing housings
by: Schiller, David (David Andrew), 1975-
Published: (2013)