The improvement of operational performance of public transport : the case for Gauteng Province, South Africa

Includes bibliographical references (leaves 105-110). === Background and Objectives: Public transport operations in South Africa, and in particular Gauteng Province, are riddled with problems. The service is characterised by poor performance, most evident in late arrivals, over crowdedness, and non-...

Full description

Bibliographic Details
Main Author: Cloete, Rodwell
Other Authors: Vanderschuren, Marianne
Format: Dissertation
Language:English
Published: University of Cape Town 2015
Subjects:
Online Access:http://hdl.handle.net/11427/14592
Description
Summary:Includes bibliographical references (leaves 105-110). === Background and Objectives: Public transport operations in South Africa, and in particular Gauteng Province, are riddled with problems. The service is characterised by poor performance, most evident in late arrivals, over crowdedness, and non-availability outside peak hours, among other. Most often, old and unsafe vehicles are used in operations, which compromise the safety of passengers. The 1997 Gauteng White Paper on Transport Policy provides for the monitoring of levels of service (LOS) as one of its key policy areas. To this effect, this research aimed to determine minimum and target public transport LOS, based on the actual level of service provision in Gauteng Province. Emphasis was placed on the provision of public transport services in areas where the greatest need exists and that will benefit most from improvements to the system. Broadly defined, this research aimed to provide answers to the questions set out below. * Is there any public transport service available and is it possible to gain access to it? * How frequently are the services provided? * Is the service affordable? * What level of service can be expected? * What are the demand and cost implications of providing an improved service? The main objectives of this research was thus to develop appropriate and sustainable public transport KPls and LOS, to test the practicality of formulated KPls and LOS, and to establish the additional investment levels required to address the backlog within the public transport system in Gauteng.