Geophysical and industrial requirements of large scale rollout of concentrating solar power (CSP) in South Africa
Includes abstract. === Includes bibliographical references (leaves 147-159). === This study investigates the requirements and implications if South Africa were to evolve its electricity supply structure to a large emphasis on Concentrated Solar Power (CSP). It does this by assessing the local geogra...
Main Author: | |
---|---|
Other Authors: | |
Format: | Dissertation |
Language: | English |
Published: |
University of Cape Town
2015
|
Subjects: | |
Online Access: | http://hdl.handle.net/11427/12107 |
id |
ndltd-netd.ac.za-oai-union.ndltd.org-uct-oai-localhost-11427-12107 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-netd.ac.za-oai-union.ndltd.org-uct-oai-localhost-11427-121072020-12-10T05:11:07Z Geophysical and industrial requirements of large scale rollout of concentrating solar power (CSP) in South Africa Morse, Warren Winkler, Harald Engineering Includes abstract. Includes bibliographical references (leaves 147-159). This study investigates the requirements and implications if South Africa were to evolve its electricity supply structure to a large emphasis on Concentrated Solar Power (CSP). It does this by assessing the local geographical conditions and what are the land, water and radiation requirements of CSP followed by an investigation into the transmission grid requirements. Recommendations are drawn up of possible grid expansion options followed by a comparison of current national expansion plans. Energy storage was pinpointed as being a key to the large scale uptake of CSP where intermittent, solar energy’s capacity factor can be significantly up scaled to suit the national load profile. Storage options were evaluated, assessed and compared after which recommendations were made for immediate and future installations. The other key issue for the national uptake of CSP is sustainable development and the need to cultivate and grow a local design, manufacturing, construction and operations industry centred around CSP. This dissertation looks at the potential employment creation of CSP, along with materials estimates, manufacturing requirements and the skills needed to facilitate the industry. 2015-01-13T03:47:21Z 2015-01-13T03:47:21Z 2009 Master Thesis Masters MSc http://hdl.handle.net/11427/12107 eng application/pdf University of Cape Town Faculty of Engineering and the Built Environment Energy Research Centre |
collection |
NDLTD |
language |
English |
format |
Dissertation |
sources |
NDLTD |
topic |
Engineering |
spellingShingle |
Engineering Morse, Warren Geophysical and industrial requirements of large scale rollout of concentrating solar power (CSP) in South Africa |
description |
Includes abstract. === Includes bibliographical references (leaves 147-159). === This study investigates the requirements and implications if South Africa were to evolve its electricity supply structure to a large emphasis on Concentrated Solar Power (CSP). It does this by assessing the local geographical conditions and what are the land, water and radiation requirements of CSP followed by an investigation into the transmission grid requirements. Recommendations are drawn up of possible grid expansion options followed by a comparison of current national expansion plans. Energy storage was pinpointed as being a key to the large scale uptake of CSP where intermittent, solar energy’s capacity factor can be significantly up scaled to suit the national load profile. Storage options were evaluated, assessed and compared after which recommendations were made for immediate and future installations. The other key issue for the national uptake of CSP is sustainable development and the need to cultivate and grow a local design, manufacturing, construction and operations industry centred around CSP. This dissertation looks at the potential employment creation of CSP, along with materials estimates, manufacturing requirements and the skills needed to facilitate the industry. |
author2 |
Winkler, Harald |
author_facet |
Winkler, Harald Morse, Warren |
author |
Morse, Warren |
author_sort |
Morse, Warren |
title |
Geophysical and industrial requirements of large scale rollout of concentrating solar power (CSP) in South Africa |
title_short |
Geophysical and industrial requirements of large scale rollout of concentrating solar power (CSP) in South Africa |
title_full |
Geophysical and industrial requirements of large scale rollout of concentrating solar power (CSP) in South Africa |
title_fullStr |
Geophysical and industrial requirements of large scale rollout of concentrating solar power (CSP) in South Africa |
title_full_unstemmed |
Geophysical and industrial requirements of large scale rollout of concentrating solar power (CSP) in South Africa |
title_sort |
geophysical and industrial requirements of large scale rollout of concentrating solar power (csp) in south africa |
publisher |
University of Cape Town |
publishDate |
2015 |
url |
http://hdl.handle.net/11427/12107 |
work_keys_str_mv |
AT morsewarren geophysicalandindustrialrequirementsoflargescalerolloutofconcentratingsolarpowercspinsouthafrica |
_version_ |
1719369106547802112 |