Assessing the contribution of quality and efficiency initiatives to reduce productions costs at Distell's Green Park

Thesis (MBA (Business Management))--Stellenbosch University, 2008. === ENGLISH ABSTRACT: Manufacturers can gain a competitive advantage through lower production cost, better quality, better efficiencies and being more flexible and dependable than its competitors. Lower production cost can be a resul...

Full description

Bibliographic Details
Main Author: Smit, Wiehahn
Other Authors: Butler, Martin
Language:en_ZA
Published: Stellenbosch : Stellenbosch University 2010
Subjects:
Online Access:http://hdl.handle.net/10019.1/5042
id ndltd-netd.ac.za-oai-union.ndltd.org-sun-oai-scholar.sun.ac.za-10019.1-5042
record_format oai_dc
collection NDLTD
language en_ZA
sources NDLTD
topic Manufacturing processes -- Cost effectiveness
Distell (Firm)
Manufacturing processes -- Quality control
Dissertations -- Business management
Theses -- Business management
spellingShingle Manufacturing processes -- Cost effectiveness
Distell (Firm)
Manufacturing processes -- Quality control
Dissertations -- Business management
Theses -- Business management
Smit, Wiehahn
Assessing the contribution of quality and efficiency initiatives to reduce productions costs at Distell's Green Park
description Thesis (MBA (Business Management))--Stellenbosch University, 2008. === ENGLISH ABSTRACT: Manufacturers can gain a competitive advantage through lower production cost, better quality, better efficiencies and being more flexible and dependable than its competitors. Lower production cost can be a result of first-time-right quality products and efficient production processes in terms of throughput. Low production cost is not a destination but a journey where the goalpost will always move as competitors will continuously come up with ideas to lower prices and margins have to be cut in order to stay competitive. This is where manufacturers must come up with initiatives to continuously drive its operational metrics to remain competitive. This research report will explain how Distell's biggest bottling plant, Green Park, successfully introduced Process Control to increase its quality operational metric and a Six Sigma project to reduce downtime to increase its efficiency operational metric to drive its operational costs down. Process Control was introduced as a TOM initiative with a subsequent reduction in rework due to poor quality (thousands) from R1 585 to R484. This contributed to 'first-time-right' production, better efficiencies and not tying up valuable production time with reworks. The Six Sigma principles were used on a production line to introduce initiatives to reduce changeovers and unplanned downtime to improve its GEE. This initiative has a projected benefit of R687 (thousands). The report also indicated that a 1% increase in Green Park's overall GEE will result in 1% saving of production hours resulting in a 1% saving of variable cost. This will result in an OEE of 63% that will save 226 hours and R410(thousands). === AFRIKAANSE OPSOMMING: Vervaardigers kan 'n kompeterende voorsprong verkry deur laer produksiekoste, beter gehalte en groter doeltreffendheid te bewerkstellig en deur meer buigbaar en betroubaar as hul teestanders te wees. Goeie gehalte produkte wat die eerste keer reg is en doeltreffende produksieprosesse vir verwerkingskapasiteit kan laer produksiekoste tot gevolg het. Lae produksiekoste is nie 'n bestemming nie, maar 'n reis waartydens die doelpale sal skuif met teestanders wat deurgaans met idees om pryse te verjaag, vorendag sal kom. Winsgrense sal moet verklein word om kompeterend te bly. Hier moet vervaardigers inisiatief aan die dag lê om hul operasionele meetbares te dryf om kompeterend te bly. Hierdie navorsingsverslag sal verduidelik hoe Distell se grootste botterings aanleg, Green Park, prosesbeheer (Process Control) suksesvol in werking gestel het om sy meetbares wat operasionele gehalte betref, te verhoog, en 'n Six Sigma-projek ingestel het om staantyd te verminder sodat sy meetbares wat operasionele doeltreffendheid betref, kan verhoog en sy operasionele koste sodoende besnoei word. Prosesbeheer is as algehele gehaltebestuursinisiatief ingestel met 'n gevolglike vermindering van herverwerking weens swak gehalte (duisende) van R1 585 na R484. Dit het bygedra tot groter doeltreffendheid met produksie wat uit die staanspoor reg is, en verhoed dat kosbare produksietyd op herverwerking gespandeer word. Die Six Sigma-beginsels is in 'n produksielyn gebruik om inisiatiewe in werking te stel om oorskakelings en onbeplande staantyd ter verbetering van die algehele toerustingsdoeltreffendheid (OEE), te verminder. Hierdie inisiatief hou 'n geprojekteerde voordeel van R687 (duisende) in. Die verslag dui verder aan dat 'n 1%-verhoging in Green Park se algehele OEE sal lei tot 'n 1% besparing in produksie-ure, wat 'n 1% besparing op veranderlike koste tot gevolg het. Dit sal tot 'n OEE van 63% lei, wat 226 uur en R410 (duisende) sal spaar.
author2 Butler, Martin
author_facet Butler, Martin
Smit, Wiehahn
author Smit, Wiehahn
author_sort Smit, Wiehahn
title Assessing the contribution of quality and efficiency initiatives to reduce productions costs at Distell's Green Park
title_short Assessing the contribution of quality and efficiency initiatives to reduce productions costs at Distell's Green Park
title_full Assessing the contribution of quality and efficiency initiatives to reduce productions costs at Distell's Green Park
title_fullStr Assessing the contribution of quality and efficiency initiatives to reduce productions costs at Distell's Green Park
title_full_unstemmed Assessing the contribution of quality and efficiency initiatives to reduce productions costs at Distell's Green Park
title_sort assessing the contribution of quality and efficiency initiatives to reduce productions costs at distell's green park
publisher Stellenbosch : Stellenbosch University
publishDate 2010
url http://hdl.handle.net/10019.1/5042
work_keys_str_mv AT smitwiehahn assessingthecontributionofqualityandefficiencyinitiativestoreduceproductionscostsatdistellsgreenpark
_version_ 1718165870491992064
spelling ndltd-netd.ac.za-oai-union.ndltd.org-sun-oai-scholar.sun.ac.za-10019.1-50422016-01-29T04:04:04Z Assessing the contribution of quality and efficiency initiatives to reduce productions costs at Distell's Green Park Smit, Wiehahn Butler, Martin Stellenbosch University. Faculty of Economic and Management Sciences. Graduate School of Business. Manufacturing processes -- Cost effectiveness Distell (Firm) Manufacturing processes -- Quality control Dissertations -- Business management Theses -- Business management Thesis (MBA (Business Management))--Stellenbosch University, 2008. ENGLISH ABSTRACT: Manufacturers can gain a competitive advantage through lower production cost, better quality, better efficiencies and being more flexible and dependable than its competitors. Lower production cost can be a result of first-time-right quality products and efficient production processes in terms of throughput. Low production cost is not a destination but a journey where the goalpost will always move as competitors will continuously come up with ideas to lower prices and margins have to be cut in order to stay competitive. This is where manufacturers must come up with initiatives to continuously drive its operational metrics to remain competitive. This research report will explain how Distell's biggest bottling plant, Green Park, successfully introduced Process Control to increase its quality operational metric and a Six Sigma project to reduce downtime to increase its efficiency operational metric to drive its operational costs down. Process Control was introduced as a TOM initiative with a subsequent reduction in rework due to poor quality (thousands) from R1 585 to R484. This contributed to 'first-time-right' production, better efficiencies and not tying up valuable production time with reworks. The Six Sigma principles were used on a production line to introduce initiatives to reduce changeovers and unplanned downtime to improve its GEE. This initiative has a projected benefit of R687 (thousands). The report also indicated that a 1% increase in Green Park's overall GEE will result in 1% saving of production hours resulting in a 1% saving of variable cost. This will result in an OEE of 63% that will save 226 hours and R410(thousands). AFRIKAANSE OPSOMMING: Vervaardigers kan 'n kompeterende voorsprong verkry deur laer produksiekoste, beter gehalte en groter doeltreffendheid te bewerkstellig en deur meer buigbaar en betroubaar as hul teestanders te wees. Goeie gehalte produkte wat die eerste keer reg is en doeltreffende produksieprosesse vir verwerkingskapasiteit kan laer produksiekoste tot gevolg het. Lae produksiekoste is nie 'n bestemming nie, maar 'n reis waartydens die doelpale sal skuif met teestanders wat deurgaans met idees om pryse te verjaag, vorendag sal kom. Winsgrense sal moet verklein word om kompeterend te bly. Hier moet vervaardigers inisiatief aan die dag lê om hul operasionele meetbares te dryf om kompeterend te bly. Hierdie navorsingsverslag sal verduidelik hoe Distell se grootste botterings aanleg, Green Park, prosesbeheer (Process Control) suksesvol in werking gestel het om sy meetbares wat operasionele gehalte betref, te verhoog, en 'n Six Sigma-projek ingestel het om staantyd te verminder sodat sy meetbares wat operasionele doeltreffendheid betref, kan verhoog en sy operasionele koste sodoende besnoei word. Prosesbeheer is as algehele gehaltebestuursinisiatief ingestel met 'n gevolglike vermindering van herverwerking weens swak gehalte (duisende) van R1 585 na R484. Dit het bygedra tot groter doeltreffendheid met produksie wat uit die staanspoor reg is, en verhoed dat kosbare produksietyd op herverwerking gespandeer word. Die Six Sigma-beginsels is in 'n produksielyn gebruik om inisiatiewe in werking te stel om oorskakelings en onbeplande staantyd ter verbetering van die algehele toerustingsdoeltreffendheid (OEE), te verminder. Hierdie inisiatief hou 'n geprojekteerde voordeel van R687 (duisende) in. Die verslag dui verder aan dat 'n 1%-verhoging in Green Park se algehele OEE sal lei tot 'n 1% besparing in produksie-ure, wat 'n 1% besparing op veranderlike koste tot gevolg het. Dit sal tot 'n OEE van 63% lei, wat 226 uur en R410 (duisende) sal spaar. 2010-12-10T06:09:57Z 2010-12-10T06:09:57Z 2008-12 Thesis http://hdl.handle.net/10019.1/5042 en_ZA Stellenbosch University Stellenbosch : Stellenbosch University