Load shift through optimal control of complex underground rock winders /|cMzwandile Arthur Buthelezi
South Africa's national power utility, Eskom, initiated a Demand Side Management (DSM) drive to help alleviate the electricity supply shortage experienced in South Africa. The focus of this study is on a load-shifting intervention applied in the mining environment. Load shifting is an appealing...
Main Author: | Buthelezi, Mzwandile Arthur |
---|---|
Language: | en |
Published: |
North-West University
2011
|
Subjects: | |
Online Access: | http://hdl.handle.net/10394/4702 |
Similar Items
-
Load shift through optimal control of complex underground rock winders /|cMzwandile Arthur Buthelezi
by: Buthelezi, Mzwandile Arthur
Published: (2011) -
EC-Winder
by: Lundström, Daniel, et al.
Published: (2007) -
Optimal control on rock winder hoist scheduling
by: Badenhorst, Werner
Published: (2013) -
Concepts in American Local History: Community in Winder, Idaho
by: Goodwin, Lorine S.
Published: (1981) -
Automatic Generation of High-Accuracy Stair Paths for Straight, Spiral, and Winder Stairs Using IFC-Based Models
by: Will Y. Lin
Published: (2020-03-01)