The development, implementation and performance evaluation of an innovative residential load management system / Abraham Zacharias Dalgleish
The power utility of South Africa, Eskom, expected a supply shortfall of approximately 400MW between February and August 2006 in the Western Cape. The peak of the crisis was in mid-winter (June to August). This shortfall was firstly caused when Eskom experienced a breakdown on the one of the two nuc...
Main Author: | Dalgleish, Abraham Zacharias |
---|---|
Published: |
North-West University
2011
|
Subjects: | |
Online Access: | http://hdl.handle.net/10394/4003 |
Similar Items
-
The development, implementation and performance evaluation of an innovative residential load management system / Abraham Zacharias Dalgleish
by: Dalgleish, Abraham Zacharias
Published: (2011) -
Residential Flexibility Management: A Case Study in Distribution Networks
by: Jussi Kiljander, et al.
Published: (2019-01-01) -
Classification of Measures for Dealing with District Heating Load Variations—A Systematic Review
by: Danica Djurić Ilić
Published: (2021-12-01) -
Synthetic residential load models for smart city energy management simulations
by: Fernando B. dos Reis, et al.
Published: (2020-02-01) -
Performance Analysis of Hybridization of Heuristic Techniques for Residential Load Scheduling
by: Zafar Iqbal, et al.
Published: (2018-10-01)