Control of an underground rock winder system to reduce electricity costs on RSA gold mines / Jan Corné Vosloo

This dissertation discusses and presents the necessary steps to identify, simulate and control an underground rock winder system. This is done to reduce the electricity bill on a mine without influencing production. These elements were developed for the gold mining industry in South Africa, as it co...

Full description

Bibliographic Details
Main Author: Vosloo, Jan Corné
Published: North-West University 2009
Online Access:http://hdl.handle.net/10394/1283
id ndltd-netd.ac.za-oai-union.ndltd.org-nwu-oai-dspace.nwu.ac.za-10394-1283
record_format oai_dc
spelling ndltd-netd.ac.za-oai-union.ndltd.org-nwu-oai-dspace.nwu.ac.za-10394-12832014-04-16T03:53:01ZControl of an underground rock winder system to reduce electricity costs on RSA gold mines / Jan Corné VoslooVosloo, Jan CornéThis dissertation discusses and presents the necessary steps to identify, simulate and control an underground rock winder system. This is done to reduce the electricity bill on a mine without influencing production. These elements were developed for the gold mining industry in South Africa, as it consumes a big part of the South African electricity supply. The backbone of this research was based on the time-of-use electricity pricing structure, and the Eskom Demand Side Management (DSM) program. An Energy Savings Company (ESCO) usually performs such an energy analysis on mining appliances, and this thesis can guide the ESCO in completing the project with success. The tools developed were Real-time Energy Management System (REMS) Winder and REMS Winder Simulator. These integrated tools aim to predict and control load management on rock winders. This system was successfully implemented on Kopanang gold mine in South Africa. The average load shift obtained in the first month after project completion (June 2006) was 3.5MW, which resulted in a monthly savings of R38,OOO. A pilot study was further conducted on three other major rock winder systems in the Western-Deep area. From this study it was found that a maximum evening load shift of 9.5MW and a saving of R1.3 million could be realised. This research showed that with the necessary historical data and accurate simulations, a load shifting project can be successfully implemented on a mine's rock winder system. This new system can be implemented on both platinum and gold mines.Thesis (M.Ing. (Electrical Engineering))--North-West University, Potchefstroom Campus, 2007.North-West University2009-03-03T05:51:39Z2009-03-03T05:51:39Z2006Thesishttp://hdl.handle.net/10394/1283
collection NDLTD
sources NDLTD
description This dissertation discusses and presents the necessary steps to identify, simulate and control an underground rock winder system. This is done to reduce the electricity bill on a mine without influencing production. These elements were developed for the gold mining industry in South Africa, as it consumes a big part of the South African electricity supply. The backbone of this research was based on the time-of-use electricity pricing structure, and the Eskom Demand Side Management (DSM) program. An Energy Savings Company (ESCO) usually performs such an energy analysis on mining appliances, and this thesis can guide the ESCO in completing the project with success. The tools developed were Real-time Energy Management System (REMS) Winder and REMS Winder Simulator. These integrated tools aim to predict and control load management on rock winders. This system was successfully implemented on Kopanang gold mine in South Africa. The average load shift obtained in the first month after project completion (June 2006) was 3.5MW, which resulted in a monthly savings of R38,OOO. A pilot study was further conducted on three other major rock winder systems in the Western-Deep area. From this study it was found that a maximum evening load shift of 9.5MW and a saving of R1.3 million could be realised. This research showed that with the necessary historical data and accurate simulations, a load shifting project can be successfully implemented on a mine's rock winder system. This new system can be implemented on both platinum and gold mines. === Thesis (M.Ing. (Electrical Engineering))--North-West University, Potchefstroom Campus, 2007.
author Vosloo, Jan Corné
spellingShingle Vosloo, Jan Corné
Control of an underground rock winder system to reduce electricity costs on RSA gold mines / Jan Corné Vosloo
author_facet Vosloo, Jan Corné
author_sort Vosloo, Jan Corné
title Control of an underground rock winder system to reduce electricity costs on RSA gold mines / Jan Corné Vosloo
title_short Control of an underground rock winder system to reduce electricity costs on RSA gold mines / Jan Corné Vosloo
title_full Control of an underground rock winder system to reduce electricity costs on RSA gold mines / Jan Corné Vosloo
title_fullStr Control of an underground rock winder system to reduce electricity costs on RSA gold mines / Jan Corné Vosloo
title_full_unstemmed Control of an underground rock winder system to reduce electricity costs on RSA gold mines / Jan Corné Vosloo
title_sort control of an underground rock winder system to reduce electricity costs on rsa gold mines / jan corné vosloo
publisher North-West University
publishDate 2009
url http://hdl.handle.net/10394/1283
work_keys_str_mv AT vosloojancorne controlofanundergroundrockwindersystemtoreduceelectricitycostsonrsagoldminesjancornevosloo
_version_ 1716663429254610944