Control of an underground rock winder system to reduce electricity costs on RSA gold mines / Jan Corné Vosloo
This dissertation discusses and presents the necessary steps to identify, simulate and control an underground rock winder system. This is done to reduce the electricity bill on a mine without influencing production. These elements were developed for the gold mining industry in South Africa, as it co...
Main Author: | |
---|---|
Published: |
North-West University
2009
|
Online Access: | http://hdl.handle.net/10394/1283 |
id |
ndltd-netd.ac.za-oai-union.ndltd.org-nwu-oai-dspace.nwu.ac.za-10394-1283 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-netd.ac.za-oai-union.ndltd.org-nwu-oai-dspace.nwu.ac.za-10394-12832014-04-16T03:53:01ZControl of an underground rock winder system to reduce electricity costs on RSA gold mines / Jan Corné VoslooVosloo, Jan CornéThis dissertation discusses and presents the necessary steps to identify, simulate and control an underground rock winder system. This is done to reduce the electricity bill on a mine without influencing production. These elements were developed for the gold mining industry in South Africa, as it consumes a big part of the South African electricity supply. The backbone of this research was based on the time-of-use electricity pricing structure, and the Eskom Demand Side Management (DSM) program. An Energy Savings Company (ESCO) usually performs such an energy analysis on mining appliances, and this thesis can guide the ESCO in completing the project with success. The tools developed were Real-time Energy Management System (REMS) Winder and REMS Winder Simulator. These integrated tools aim to predict and control load management on rock winders. This system was successfully implemented on Kopanang gold mine in South Africa. The average load shift obtained in the first month after project completion (June 2006) was 3.5MW, which resulted in a monthly savings of R38,OOO. A pilot study was further conducted on three other major rock winder systems in the Western-Deep area. From this study it was found that a maximum evening load shift of 9.5MW and a saving of R1.3 million could be realised. This research showed that with the necessary historical data and accurate simulations, a load shifting project can be successfully implemented on a mine's rock winder system. This new system can be implemented on both platinum and gold mines.Thesis (M.Ing. (Electrical Engineering))--North-West University, Potchefstroom Campus, 2007.North-West University2009-03-03T05:51:39Z2009-03-03T05:51:39Z2006Thesishttp://hdl.handle.net/10394/1283 |
collection |
NDLTD |
sources |
NDLTD |
description |
This dissertation discusses and presents the necessary steps to identify, simulate and
control an underground rock winder system. This is done to reduce the electricity bill on a
mine without influencing production. These elements were developed for the gold mining
industry in South Africa, as it consumes a big part of the South African electricity supply.
The backbone of this research was based on the time-of-use electricity pricing structure,
and the Eskom Demand Side Management (DSM) program. An Energy Savings
Company (ESCO) usually performs such an energy analysis on mining appliances, and
this thesis can guide the ESCO in completing the project with success.
The tools developed were Real-time Energy Management System (REMS) Winder and
REMS Winder Simulator. These integrated tools aim to predict and control load
management on rock winders.
This system was successfully implemented on Kopanang gold mine in South Africa. The
average load shift obtained in the first month after project completion (June 2006) was
3.5MW, which resulted in a monthly savings of R38,OOO. A pilot study was further
conducted on three other major rock winder systems in the Western-Deep area. From this
study it was found that a maximum evening load shift of 9.5MW and a saving of R1.3
million could be realised.
This research showed that with the necessary historical data and accurate simulations, a
load shifting project can be successfully implemented on a mine's rock winder system.
This new system can be implemented on both platinum and gold mines. === Thesis (M.Ing. (Electrical Engineering))--North-West University, Potchefstroom Campus, 2007. |
author |
Vosloo, Jan Corné |
spellingShingle |
Vosloo, Jan Corné Control of an underground rock winder system to reduce electricity costs on RSA gold mines / Jan Corné Vosloo |
author_facet |
Vosloo, Jan Corné |
author_sort |
Vosloo, Jan Corné |
title |
Control of an underground rock winder system to reduce electricity costs on RSA gold mines / Jan Corné Vosloo |
title_short |
Control of an underground rock winder system to reduce electricity costs on RSA gold mines / Jan Corné Vosloo |
title_full |
Control of an underground rock winder system to reduce electricity costs on RSA gold mines / Jan Corné Vosloo |
title_fullStr |
Control of an underground rock winder system to reduce electricity costs on RSA gold mines / Jan Corné Vosloo |
title_full_unstemmed |
Control of an underground rock winder system to reduce electricity costs on RSA gold mines / Jan Corné Vosloo |
title_sort |
control of an underground rock winder system to reduce electricity costs on rsa gold mines / jan corné vosloo |
publisher |
North-West University |
publishDate |
2009 |
url |
http://hdl.handle.net/10394/1283 |
work_keys_str_mv |
AT vosloojancorne controlofanundergroundrockwindersystemtoreduceelectricitycostsonrsagoldminesjancornevosloo |
_version_ |
1716663429254610944 |