Evaluation of upstream and downstream process parameters on electrostatic precipitator performance / Gert Petrus Peens

New emission legislation regarding air pollution control, as instructed by the Department of Environmental Affairs (DEA) to Eskom Generation Power Stations, implies a particulate emission limit of 100 mg/Nm3 for all existing power stations by 2015 and 50 mg/Nm3 for all new and existing power station...

Full description

Bibliographic Details
Main Author: Peens, Gert Petrus
Language:en
Published: 2014
Subjects:
Online Access:http://hdl.handle.net/10394/11932
id ndltd-netd.ac.za-oai-union.ndltd.org-nwu-oai-dspace.nwu.ac.za-10394-11932
record_format oai_dc
spelling ndltd-netd.ac.za-oai-union.ndltd.org-nwu-oai-dspace.nwu.ac.za-10394-119322016-03-16T03:59:06ZEvaluation of upstream and downstream process parameters on electrostatic precipitator performance / Gert Petrus PeensPeens, Gert PetrusAir heater leakageAsh fineness distributionCoal qualityDeutsch equationDust burdenEfficiencyElectrostatic precipitatorMatts-Ohnfeldt equationMigration velocityOptimisationParticulate emission predictionPerformancePower supplySimulation modelVolume flow distributionNew emission legislation regarding air pollution control, as instructed by the Department of Environmental Affairs (DEA) to Eskom Generation Power Stations, implies a particulate emission limit of 100 mg/Nm3 for all existing power stations by 2015 and 50 mg/Nm3 for all new and existing power stations by the year 2020. Some of Eskom’s power stations which are equipped with Electrostatic Precipitators (ESP’s) were not designed for this stringent legislation. It is also experienced that ESP’s and coal quality in Eskom have deteriorated over time, resulting in the performance of the ESP’s not meeting the legislative requirements. Eskom is in the process of introducing various ESP enhancement projects to improve performance and aligning the operating philosophy to comply with the more stringent particulate emission legislation. An ESP efficiency test was conducted at Lethabo Power Station to determine the current state of the plant and performance. The results of the test were compared with the original design base specifications to determine the relevant deficiencies which contribute to high emissions and poor ESP performance. It was aimed to develop an ESP simulation model and validate the outputs with the test data. This study endeavours to demonstrate the greater impact on ESP performance when the ESP is operated outside the design specification. It is further aimed to demonstrate that a solution to the problem of high emissions is not only contributed by the variables within the ESP itself. This study is a coal to stack evaluation considering the ESP variables and the upstream conditions of the ESP that form part of the entire process. The intention of this study is to demonstrate the importance of operating an ESP at the designed parameters and highlight the significance of proper maintenance. It was learned that before any ESP enhancement technology can be implemented, the ESP and upstream conditions must be in accordance with design specifications. The implementation of an ESP enhancement technology will have no merit or justification on a unit that is being operated outside of its design specifications. The results obtained from the ESP simulation model correlated well with the ESP efficiency test data. The expectation of the model to assist operators and engineers to operate ESP’s according to the designer’s specifications was conceded.MIng (Mechanical Engineering), North-West University, Potchefstroom Campus, 20142014-10-21T07:34:04Z2014-10-21T07:34:04Z2013Thesishttp://hdl.handle.net/10394/11932en
collection NDLTD
language en
sources NDLTD
topic Air heater leakage
Ash fineness distribution
Coal quality
Deutsch equation
Dust burden
Efficiency
Electrostatic precipitator
Matts-Ohnfeldt equation
Migration velocity
Optimisation
Particulate emission prediction
Performance
Power supply
Simulation model
Volume flow distribution
spellingShingle Air heater leakage
Ash fineness distribution
Coal quality
Deutsch equation
Dust burden
Efficiency
Electrostatic precipitator
Matts-Ohnfeldt equation
Migration velocity
Optimisation
Particulate emission prediction
Performance
Power supply
Simulation model
Volume flow distribution
Peens, Gert Petrus
Evaluation of upstream and downstream process parameters on electrostatic precipitator performance / Gert Petrus Peens
description New emission legislation regarding air pollution control, as instructed by the Department of Environmental Affairs (DEA) to Eskom Generation Power Stations, implies a particulate emission limit of 100 mg/Nm3 for all existing power stations by 2015 and 50 mg/Nm3 for all new and existing power stations by the year 2020. Some of Eskom’s power stations which are equipped with Electrostatic Precipitators (ESP’s) were not designed for this stringent legislation. It is also experienced that ESP’s and coal quality in Eskom have deteriorated over time, resulting in the performance of the ESP’s not meeting the legislative requirements. Eskom is in the process of introducing various ESP enhancement projects to improve performance and aligning the operating philosophy to comply with the more stringent particulate emission legislation. An ESP efficiency test was conducted at Lethabo Power Station to determine the current state of the plant and performance. The results of the test were compared with the original design base specifications to determine the relevant deficiencies which contribute to high emissions and poor ESP performance. It was aimed to develop an ESP simulation model and validate the outputs with the test data. This study endeavours to demonstrate the greater impact on ESP performance when the ESP is operated outside the design specification. It is further aimed to demonstrate that a solution to the problem of high emissions is not only contributed by the variables within the ESP itself. This study is a coal to stack evaluation considering the ESP variables and the upstream conditions of the ESP that form part of the entire process. The intention of this study is to demonstrate the importance of operating an ESP at the designed parameters and highlight the significance of proper maintenance. It was learned that before any ESP enhancement technology can be implemented, the ESP and upstream conditions must be in accordance with design specifications. The implementation of an ESP enhancement technology will have no merit or justification on a unit that is being operated outside of its design specifications. The results obtained from the ESP simulation model correlated well with the ESP efficiency test data. The expectation of the model to assist operators and engineers to operate ESP’s according to the designer’s specifications was conceded. === MIng (Mechanical Engineering), North-West University, Potchefstroom Campus, 2014
author Peens, Gert Petrus
author_facet Peens, Gert Petrus
author_sort Peens, Gert Petrus
title Evaluation of upstream and downstream process parameters on electrostatic precipitator performance / Gert Petrus Peens
title_short Evaluation of upstream and downstream process parameters on electrostatic precipitator performance / Gert Petrus Peens
title_full Evaluation of upstream and downstream process parameters on electrostatic precipitator performance / Gert Petrus Peens
title_fullStr Evaluation of upstream and downstream process parameters on electrostatic precipitator performance / Gert Petrus Peens
title_full_unstemmed Evaluation of upstream and downstream process parameters on electrostatic precipitator performance / Gert Petrus Peens
title_sort evaluation of upstream and downstream process parameters on electrostatic precipitator performance / gert petrus peens
publishDate 2014
url http://hdl.handle.net/10394/11932
work_keys_str_mv AT peensgertpetrus evaluationofupstreamanddownstreamprocessparametersonelectrostaticprecipitatorperformancegertpetruspeens
_version_ 1718204779057905664