Cost effective electrical reticulation of the rural areas in Transkei at the district of Lady Frere (Nkolonga)

A research report submitted in partial partial compliance compliance with the requirements for the Master's Diploma in Technology: Electrical Engineering, M.L.Sultan Technikon, 1995. === The purpose of this study is to investigate the most cost effective way of electrifying rural areas in the T...

Full description

Bibliographic Details
Main Author: Booi, Bongani Mpumelelo
Other Authors: Khumalo, J.
Format: Others
Language:en
Published: 2017
Subjects:
Online Access:http://hdl.handle.net/10321/2876
Description
Summary:A research report submitted in partial partial compliance compliance with the requirements for the Master's Diploma in Technology: Electrical Engineering, M.L.Sultan Technikon, 1995. === The purpose of this study is to investigate the most cost effective way of electrifying rural areas in the Transkei concentrating in the district of Lady Frere. One Administrative Area (A.A) was used for research. Questionnaires were send to people of this area where a like rat format was followed. For the purpose of this study, 20 families were randomly selected for investigation. === M