Thesis (MEng (Electrical Engineering)--Cape Peninsula University of Technology, 2019 === The purpose of an electrical power system is to supply electrical energy to the customers. Power transformers are required to transform the system voltage from generation to transmission and distribution levels....
Main Author: | Pieters, Willem Diederick |
---|---|
Other Authors: | Tzoneva, R., Prof |
Language: | en |
Published: |
Cape Peninsula University of Technology
2020
|
Subjects: | |
Online Access: | http://hdl.handle.net/20.500.11838/3067 |
Similar Items
-
Distribution On Load Tap Changer Control Using IEC61850 Client/Server Architecture
by: Maneikis, Andrius
Published: (2016) -
The Design and Operation of IEC 61850 – Based Transformer Measuring Device
by: Paweł Kopański, et al.
Published: (2014-03-01) -
Efficient maintenance testing in digital substations based on IEC 61850 edition 2
by: Alexander Apostolov
Published: (2017-11-01) -
Aplicação dos padrões da norma IEC 61850 a subestações compartilhadas de transmissão/distribuição de energia elétrica.
by: Décio Tomasulo de Vicente
Published: (2011) -
Aplicação dos padrões da norma IEC 61850 a subestações compartilhadas de transmissão/distribuição de energia elétrica.
by: Vicente, Décio Tomasulo de
Published: (2011)