Feasibility for Use of a Seabed Gallery Intake for the Shuqaiq-II SWRO Facility, Saudi Arabia

Shuqaiq-II IWP is a combined RO water desalination and power plant facility. It operates with an open intake that feeds the plant with 100,000 m3/h of raw water. The facility is located 140 km north of Jizan, in a small bay where the run-off discharges of two wadis converge. The run-off coming from...

Full description

Bibliographic Details
Main Author: Mantilla Calderon, David
Other Authors: Missimer, Thomas M.
Language:en
Published: 2013
Subjects:
Online Access:Mantilla, D. (2013). Feasibility for Use of a Seabed Gallery Intake for the Shuqaiq-II SWRO Facility, Saudi Arabia. KAUST Research Repository. https://doi.org/10.25781/KAUST-3S203
http://hdl.handle.net/10754/292303
id ndltd-kaust.edu.sa-oai-repository.kaust.edu.sa-10754-292303
record_format oai_dc
spelling ndltd-kaust.edu.sa-oai-repository.kaust.edu.sa-10754-2923032021-02-17T05:08:54Z Feasibility for Use of a Seabed Gallery Intake for the Shuqaiq-II SWRO Facility, Saudi Arabia Mantilla Calderon, David Missimer, Thomas M. Biological and Environmental Sciences and Engineering (BESE) Division Amy, Gary L. Saikaly, Pascal SWRO pre-treatment sea bed gallery slow sand filteration (SSF) desalination water intake infiltration galleries Shuqaiq-II IWP is a combined RO water desalination and power plant facility. It operates with an open intake that feeds the plant with 100,000 m3/h of raw water. The facility is located 140 km north of Jizan, in a small bay where the run-off discharges of two wadis converge. The run-off coming from the wadis are rich in alluvial sediments that dramatically decrease the raw water quality at the intake point, causing periodic shutdowns of the plant and increasing the operational cost due to membrane replacement. Subsurface water intakes are an alternative for improving raw water quality, as they provide natural filtering of the feed water as it flows through the systems. In this type of system water flow through the sediment matrix is induced and during the percolation, several physical, chemical and biological processes take place, cleaning the water from particulate matter, resulting in high quality feed water that can be directly sent to the RO process without any additional pretreatment. A full hydrogeological profile of the seabed needs to be performed in order to determine the applicability of one of these systems in each particular location. In this study, 1 km of beach area at Shuqaiq-II IWP was surveyed. Ninety-one (91) samples from the shore and offshore sediments were collected and analyzed for hydraulic conductivity, porosity and grain size distribution. The laboratory analysis showed that the construction of the seabed galleries was technically feasible, and the proposed intake system was design to meet the feed water requirements for the RO facility (530.000 m3/d). The preliminary design consists of 17 cells in total, 16 of which will be in constant operation, and 1 alternate for whenever maintenance is needed in one of the other cells. The seabed gallery design includes 5 layers of sands with a total depth of 5 m. A detailed underdrain design methodology is presented. The system would be operated at an infiltration rate of 10 m/d and an average hydraulic retention time of 7h. Each cell will have an area of 3.500 m2 that will supply 35.000 m3/d of feed water to each RO train. 2013-05-19T06:30:47Z 2013-05-19T06:30:47Z 2013-04 Thesis Mantilla, D. (2013). Feasibility for Use of a Seabed Gallery Intake for the Shuqaiq-II SWRO Facility, Saudi Arabia. KAUST Research Repository. https://doi.org/10.25781/KAUST-3S203 10.25781/KAUST-3S203 http://hdl.handle.net/10754/292303 en
collection NDLTD
language en
sources NDLTD
topic SWRO pre-treatment
sea bed gallery
slow sand filteration (SSF)
desalination
water intake
infiltration galleries
spellingShingle SWRO pre-treatment
sea bed gallery
slow sand filteration (SSF)
desalination
water intake
infiltration galleries
Mantilla Calderon, David
Feasibility for Use of a Seabed Gallery Intake for the Shuqaiq-II SWRO Facility, Saudi Arabia
description Shuqaiq-II IWP is a combined RO water desalination and power plant facility. It operates with an open intake that feeds the plant with 100,000 m3/h of raw water. The facility is located 140 km north of Jizan, in a small bay where the run-off discharges of two wadis converge. The run-off coming from the wadis are rich in alluvial sediments that dramatically decrease the raw water quality at the intake point, causing periodic shutdowns of the plant and increasing the operational cost due to membrane replacement. Subsurface water intakes are an alternative for improving raw water quality, as they provide natural filtering of the feed water as it flows through the systems. In this type of system water flow through the sediment matrix is induced and during the percolation, several physical, chemical and biological processes take place, cleaning the water from particulate matter, resulting in high quality feed water that can be directly sent to the RO process without any additional pretreatment. A full hydrogeological profile of the seabed needs to be performed in order to determine the applicability of one of these systems in each particular location. In this study, 1 km of beach area at Shuqaiq-II IWP was surveyed. Ninety-one (91) samples from the shore and offshore sediments were collected and analyzed for hydraulic conductivity, porosity and grain size distribution. The laboratory analysis showed that the construction of the seabed galleries was technically feasible, and the proposed intake system was design to meet the feed water requirements for the RO facility (530.000 m3/d). The preliminary design consists of 17 cells in total, 16 of which will be in constant operation, and 1 alternate for whenever maintenance is needed in one of the other cells. The seabed gallery design includes 5 layers of sands with a total depth of 5 m. A detailed underdrain design methodology is presented. The system would be operated at an infiltration rate of 10 m/d and an average hydraulic retention time of 7h. Each cell will have an area of 3.500 m2 that will supply 35.000 m3/d of feed water to each RO train.
author2 Missimer, Thomas M.
author_facet Missimer, Thomas M.
Mantilla Calderon, David
author Mantilla Calderon, David
author_sort Mantilla Calderon, David
title Feasibility for Use of a Seabed Gallery Intake for the Shuqaiq-II SWRO Facility, Saudi Arabia
title_short Feasibility for Use of a Seabed Gallery Intake for the Shuqaiq-II SWRO Facility, Saudi Arabia
title_full Feasibility for Use of a Seabed Gallery Intake for the Shuqaiq-II SWRO Facility, Saudi Arabia
title_fullStr Feasibility for Use of a Seabed Gallery Intake for the Shuqaiq-II SWRO Facility, Saudi Arabia
title_full_unstemmed Feasibility for Use of a Seabed Gallery Intake for the Shuqaiq-II SWRO Facility, Saudi Arabia
title_sort feasibility for use of a seabed gallery intake for the shuqaiq-ii swro facility, saudi arabia
publishDate 2013
url Mantilla, D. (2013). Feasibility for Use of a Seabed Gallery Intake for the Shuqaiq-II SWRO Facility, Saudi Arabia. KAUST Research Repository. https://doi.org/10.25781/KAUST-3S203
http://hdl.handle.net/10754/292303
work_keys_str_mv AT mantillacalderondavid feasibilityforuseofaseabedgalleryintakefortheshuqaiqiiswrofacilitysaudiarabia
_version_ 1719377381963071488