Management option survey of a hotel property: twelve months after the completion of a major renovation and extension project.

by Mok Mo-Yin. === Thesis (M.B.A.)--Chinese University of Hong Kong, 1996. === Includes bibliographical references (leaves 51). === ABSTRACT --- p.ii === TABLE OF CONTENTS --- p.iii === LIST OF TABLES --- p.iv === ACKNOWLEDGEMENTS --- p.v === Chapter === Chapter I. --- INTRODUCTION --- p.1 ===...

Full description

Bibliographic Details
Other Authors: Mok, Mo-Yin.
Format: Others
Language:English
Published: Chinese University of Hong Kong 1996
Subjects:
Online Access:http://library.cuhk.edu.hk/record=b5888672
http://repository.lib.cuhk.edu.hk/en/item/cuhk-320752
id ndltd-cuhk.edu.hk-oai-cuhk-dr-cuhk_320752
record_format oai_dc
spelling ndltd-cuhk.edu.hk-oai-cuhk-dr-cuhk_3207522019-02-19T03:55:48Z Management option survey of a hotel property: twelve months after the completion of a major renovation and extension project. Hotel management Hotel management--China--Hong Kong Personnel management Personnel management--China--Hong Kong by Mok Mo-Yin. Thesis (M.B.A.)--Chinese University of Hong Kong, 1996. Includes bibliographical references (leaves 51). ABSTRACT --- p.ii TABLE OF CONTENTS --- p.iii LIST OF TABLES --- p.iv ACKNOWLEDGEMENTS --- p.v Chapter Chapter I. --- INTRODUCTION --- p.1 Background --- p.2 Literature Review --- p.10 Chapter II. --- METHODOLOGY --- p.13 Time of Measurement / Area Of Measurement --- p.13 Measurement Tool and Sample --- p.15 Design of Questionnaire --- p.15 Chapter III. --- FINDINGS AND DISCUSSIONS --- p.17 Response Rate --- p.17 Characteristics Of The Survey Respondents --- p.17 General Analysis Of The Results --- p.19 Detailed Discussion Of Survey Results --- p.25 Chapter IV. --- RECOMMENDATIONS --- p.30 Chapter V. --- CONCLUSION --- p.33 APPENDIX --- p.35 REFERENCES --- p.50 BIBLOGRAPHY --- p.51 Chinese University of Hong Kong Mok, Mo-Yin. Chinese University of Hong Kong Graduate School. Division of Business Administration. 1996 Text bibliography print v, 51 leaves ; 30 cm. cuhk:320752 http://library.cuhk.edu.hk/record=b5888672 eng China Hong Kong China Hong Kong Use of this resource is governed by the terms and conditions of the Creative Commons “Attribution-NonCommercial-NoDerivatives 4.0 International” License (http://creativecommons.org/licenses/by-nc-nd/4.0/) http://repository.lib.cuhk.edu.hk/en/islandora/object/cuhk%3A320752/datastream/TN/view/Management%20option%20survey%20of%20a%20hotel%20property%20%3A%20twelve%20months%20after%20the%20completion%20of%20a%20major%20renovation%20and%20extension%20project.jpghttp://repository.lib.cuhk.edu.hk/en/item/cuhk-320752
collection NDLTD
language English
format Others
sources NDLTD
topic Hotel management
Hotel management--China--Hong Kong
Personnel management
Personnel management--China--Hong Kong
spellingShingle Hotel management
Hotel management--China--Hong Kong
Personnel management
Personnel management--China--Hong Kong
Management option survey of a hotel property: twelve months after the completion of a major renovation and extension project.
description by Mok Mo-Yin. === Thesis (M.B.A.)--Chinese University of Hong Kong, 1996. === Includes bibliographical references (leaves 51). === ABSTRACT --- p.ii === TABLE OF CONTENTS --- p.iii === LIST OF TABLES --- p.iv === ACKNOWLEDGEMENTS --- p.v === Chapter === Chapter I. --- INTRODUCTION --- p.1 === Background --- p.2 === Literature Review --- p.10 === Chapter II. --- METHODOLOGY --- p.13 === Time of Measurement / Area Of Measurement --- p.13 === Measurement Tool and Sample --- p.15 === Design of Questionnaire --- p.15 === Chapter III. --- FINDINGS AND DISCUSSIONS --- p.17 === Response Rate --- p.17 === Characteristics Of The Survey Respondents --- p.17 === General Analysis Of The Results --- p.19 === Detailed Discussion Of Survey Results --- p.25 === Chapter IV. --- RECOMMENDATIONS --- p.30 === Chapter V. --- CONCLUSION --- p.33 === APPENDIX --- p.35 === REFERENCES --- p.50 === BIBLOGRAPHY --- p.51
author2 Mok, Mo-Yin.
author_facet Mok, Mo-Yin.
title Management option survey of a hotel property: twelve months after the completion of a major renovation and extension project.
title_short Management option survey of a hotel property: twelve months after the completion of a major renovation and extension project.
title_full Management option survey of a hotel property: twelve months after the completion of a major renovation and extension project.
title_fullStr Management option survey of a hotel property: twelve months after the completion of a major renovation and extension project.
title_full_unstemmed Management option survey of a hotel property: twelve months after the completion of a major renovation and extension project.
title_sort management option survey of a hotel property: twelve months after the completion of a major renovation and extension project.
publisher Chinese University of Hong Kong
publishDate 1996
url http://library.cuhk.edu.hk/record=b5888672
http://repository.lib.cuhk.edu.hk/en/item/cuhk-320752
_version_ 1718979860851851264