MRPIII for a median-size electronics manufacturer: a feasibility study.

by Ng Kwok-pui. === Thesis (M.B.A.)--Chinese University of Hong Kong, 1991. === Bibliography: leaves 63-64. === abstract --- p.ii === table of contents --- p.iii === LIST OF ILLUSTRATIONS --- p.vi === acknowledgments --- p.vii === Chapter === Chapter I. --- introduction --- p.1 === Chapter II....

Full description

Bibliographic Details
Other Authors: Ng, Kwok-pui.
Format: Others
Language:English
Published: Chinese University of Hong Kong 1991
Subjects:
Online Access:http://library.cuhk.edu.hk/record=b5886673
http://repository.lib.cuhk.edu.hk/en/item/cuhk-318723
id ndltd-cuhk.edu.hk-oai-cuhk-dr-cuhk_318723
record_format oai_dc
spelling ndltd-cuhk.edu.hk-oai-cuhk-dr-cuhk_3187232019-02-19T03:52:12Z MRPIII for a median-size electronics manufacturer: a feasibility study. Electronic industries--Production control Electronic industries--China--Hong Kong--Production control Production control Just-in-time systems by Ng Kwok-pui. Thesis (M.B.A.)--Chinese University of Hong Kong, 1991. Bibliography: leaves 63-64. abstract --- p.ii table of contents --- p.iii LIST OF ILLUSTRATIONS --- p.vi acknowledgments --- p.vii Chapter Chapter I. --- introduction --- p.1 Chapter II. --- MANUFACTURING RESOURCES PLANNING (MRPII) AND JUST-IN-TIME (JIT) PHILOSOPHY --- p.5 MRPII vs JIT: Comments from Two Articles --- p.5 Manufacturing Resources Planning and Control System (MRPII) in XYZ --- p.7 Inventory Control --- p.7 Bills of Materials --- p.8 Master Production Scheduling --- p.8 Material Requirements Planning --- p.9 Routing/Work Center --- p.9 Capacity Requirements Planning --- p.10 Shop Floor Control --- p.10 Cost Accounting --- p.11 Lot Traceability --- p.11 Sales Order Processing --- p.12 Purchasing --- p.12 Materials Receiving --- p.13 General Ledger (G/L) --- p.13 Accounts Receivable (A/R) --- p.13 Accounts Payable --- p.14 Payroll --- p.14 Personnel Management --- p.14 Fixed Assets Management --- p.15 CAD/Quotation/BOM System --- p.15 Export Documentation --- p.15 Problems with MRPII --- p.15 What is JIT? --- p.18 Problems with JIT --- p.21 Integrating JIT with MRPII --- p.23 Chapter III. --- HOW CAN A HYBRID SYSTEM OF MRP AND JIT BE APPLIED TO XYZ? --- p.29 XYZ's Performance in MRPII and JIT --- p.29 Other Problems with the Production Control System --- p.30 What Hybrid System will Best Suit XYZ? --- p.32 Integrating MRPII and JIT through Software Unification --- p.34 Manufacturing Specifications --- p.36 Materials Planning --- p.38 Manufacturing Control --- p.39 Integration of MRP and JIT --- p.40 Implication of Software Unification to XYZ? --- p.42 Chapter IV. --- CONCLUSION --- p.45 APPENDIXES Appendix 1 --- p.47 Appendix 2 --- p.53 Appendix 3 --- p.58 BIBLIOGRAPHY --- p.63 Chinese University of Hong Kong Ng, Kwok-pui. Chinese University of Hong Kong Graduate School. Division of Business Administration. 1991 Text bibliography print vii, 64 leaves : ill. ; 30 cm. cuhk:318723 http://library.cuhk.edu.hk/record=b5886673 eng China Hong Kong Use of this resource is governed by the terms and conditions of the Creative Commons “Attribution-NonCommercial-NoDerivatives 4.0 International” License (http://creativecommons.org/licenses/by-nc-nd/4.0/) http://repository.lib.cuhk.edu.hk/en/islandora/object/cuhk%3A318723/datastream/TN/view/MRPIII%20for%20a%20median-size%20electronics%20manufacturer%20%3A%20a%20feasibility%20study.jpghttp://repository.lib.cuhk.edu.hk/en/item/cuhk-318723
collection NDLTD
language English
format Others
sources NDLTD
topic Electronic industries--Production control
Electronic industries--China--Hong Kong--Production control
Production control
Just-in-time systems
spellingShingle Electronic industries--Production control
Electronic industries--China--Hong Kong--Production control
Production control
Just-in-time systems
MRPIII for a median-size electronics manufacturer: a feasibility study.
description by Ng Kwok-pui. === Thesis (M.B.A.)--Chinese University of Hong Kong, 1991. === Bibliography: leaves 63-64. === abstract --- p.ii === table of contents --- p.iii === LIST OF ILLUSTRATIONS --- p.vi === acknowledgments --- p.vii === Chapter === Chapter I. --- introduction --- p.1 === Chapter II. --- MANUFACTURING RESOURCES PLANNING (MRPII) AND JUST-IN-TIME (JIT) PHILOSOPHY --- p.5 === MRPII vs JIT: Comments from Two Articles --- p.5 === Manufacturing Resources Planning and Control System (MRPII) in XYZ --- p.7 === Inventory Control --- p.7 === Bills of Materials --- p.8 === Master Production Scheduling --- p.8 === Material Requirements Planning --- p.9 === Routing/Work Center --- p.9 === Capacity Requirements Planning --- p.10 === Shop Floor Control --- p.10 === Cost Accounting --- p.11 === Lot Traceability --- p.11 === Sales Order Processing --- p.12 === Purchasing --- p.12 === Materials Receiving --- p.13 === General Ledger (G/L) --- p.13 === Accounts Receivable (A/R) --- p.13 === Accounts Payable --- p.14 === Payroll --- p.14 === Personnel Management --- p.14 === Fixed Assets Management --- p.15 === CAD/Quotation/BOM System --- p.15 === Export Documentation --- p.15 === Problems with MRPII --- p.15 === What is JIT? --- p.18 === Problems with JIT --- p.21 === Integrating JIT with MRPII --- p.23 === Chapter III. --- HOW CAN A HYBRID SYSTEM OF MRP AND JIT BE APPLIED TO XYZ? --- p.29 === XYZ's Performance in MRPII and JIT --- p.29 === Other Problems with the Production Control System --- p.30 === What Hybrid System will Best Suit XYZ? --- p.32 === Integrating MRPII and JIT through Software Unification --- p.34 === Manufacturing Specifications --- p.36 === Materials Planning --- p.38 === Manufacturing Control --- p.39 === Integration of MRP and JIT --- p.40 === Implication of Software Unification to XYZ? --- p.42 === Chapter IV. --- CONCLUSION --- p.45 === APPENDIXES === Appendix 1 --- p.47 === Appendix 2 --- p.53 === Appendix 3 --- p.58 === BIBLIOGRAPHY --- p.63
author2 Ng, Kwok-pui.
author_facet Ng, Kwok-pui.
title MRPIII for a median-size electronics manufacturer: a feasibility study.
title_short MRPIII for a median-size electronics manufacturer: a feasibility study.
title_full MRPIII for a median-size electronics manufacturer: a feasibility study.
title_fullStr MRPIII for a median-size electronics manufacturer: a feasibility study.
title_full_unstemmed MRPIII for a median-size electronics manufacturer: a feasibility study.
title_sort mrpiii for a median-size electronics manufacturer: a feasibility study.
publisher Chinese University of Hong Kong
publishDate 1991
url http://library.cuhk.edu.hk/record=b5886673
http://repository.lib.cuhk.edu.hk/en/item/cuhk-318723
_version_ 1718979264032800768