Synchronous measurements and power quality monitoring.
The task of simultaneous power systems measurements at locations which can be hundreds of kilometres apart carries the problem of precise synchronisation. To introduce this topic, this thesis begins with an overview of time, time stamping and synchronised data acquisition, and reviews its applicatio...
Main Author: | |
---|---|
Language: | en |
Published: |
University of Canterbury. Electrical and Electronic Engineering
2012
|
Online Access: | http://hdl.handle.net/10092/6158 |