Power system optimisation : deterministic and stochastic annual scheduling.
The optimisation of hydro-thermal power systems over a one year horizon is investigated. The objective is to minimise fuel costs by appropriate scheduling of releases from large hydro storage lakes. Fuel cost is the principle avoidable expense in operating such a system as hydro station costs are in...
Main Author: | |
---|---|
Language: | en |
Published: |
University of Canterbury. Electrical Engineering
2012
|
Online Access: | http://hdl.handle.net/10092/6156 |