Controlling schedule duration during software project execution

This thesis describes a method of identifying the influences on schedule delays in projects that develop large software systems. Controlling schedule duration is a fundamental aspect of managing projects because of the financial losses associated with late projects. While challenges with controlling...

Full description

Bibliographic Details
Main Author: Ahmedshareef, Zana
Published: University of Brighton 2015
Subjects:
Online Access:https://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.667851
id ndltd-bl.uk-oai-ethos.bl.uk-667851
record_format oai_dc
spelling ndltd-bl.uk-oai-ethos.bl.uk-6678512018-10-16T03:23:51ZControlling schedule duration during software project executionAhmedshareef, Zana2015This thesis describes a method of identifying the influences on schedule delays in projects that develop large software systems. Controlling schedule duration is a fundamental aspect of managing projects because of the financial losses associated with late projects. While challenges with controlling software projects have been investigated, there still seemed to be more to be learned about the interplay of a range of factors during project execution and that affect project duration when developing and integrating software systems within enterprise architecture environment.005.3G000 Computing and Mathematical SciencesUniversity of Brightonhttps://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.667851https://research.brighton.ac.uk/en/studentTheses/819fb81b-e3c1-40ce-bad9-f44308fdbc79Electronic Thesis or Dissertation
collection NDLTD
sources NDLTD
topic 005.3
G000 Computing and Mathematical Sciences
spellingShingle 005.3
G000 Computing and Mathematical Sciences
Ahmedshareef, Zana
Controlling schedule duration during software project execution
description This thesis describes a method of identifying the influences on schedule delays in projects that develop large software systems. Controlling schedule duration is a fundamental aspect of managing projects because of the financial losses associated with late projects. While challenges with controlling software projects have been investigated, there still seemed to be more to be learned about the interplay of a range of factors during project execution and that affect project duration when developing and integrating software systems within enterprise architecture environment.
author Ahmedshareef, Zana
author_facet Ahmedshareef, Zana
author_sort Ahmedshareef, Zana
title Controlling schedule duration during software project execution
title_short Controlling schedule duration during software project execution
title_full Controlling schedule duration during software project execution
title_fullStr Controlling schedule duration during software project execution
title_full_unstemmed Controlling schedule duration during software project execution
title_sort controlling schedule duration during software project execution
publisher University of Brighton
publishDate 2015
url https://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.667851
work_keys_str_mv AT ahmedshareefzana controllingscheduledurationduringsoftwareprojectexecution
_version_ 1718774203554988032