Controlling schedule duration during software project execution
This thesis describes a method of identifying the influences on schedule delays in projects that develop large software systems. Controlling schedule duration is a fundamental aspect of managing projects because of the financial losses associated with late projects. While challenges with controlling...
Main Author: | |
---|---|
Published: |
University of Brighton
2015
|
Subjects: | |
Online Access: | https://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.667851 |
id |
ndltd-bl.uk-oai-ethos.bl.uk-667851 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-bl.uk-oai-ethos.bl.uk-6678512018-10-16T03:23:51ZControlling schedule duration during software project executionAhmedshareef, Zana2015This thesis describes a method of identifying the influences on schedule delays in projects that develop large software systems. Controlling schedule duration is a fundamental aspect of managing projects because of the financial losses associated with late projects. While challenges with controlling software projects have been investigated, there still seemed to be more to be learned about the interplay of a range of factors during project execution and that affect project duration when developing and integrating software systems within enterprise architecture environment.005.3G000 Computing and Mathematical SciencesUniversity of Brightonhttps://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.667851https://research.brighton.ac.uk/en/studentTheses/819fb81b-e3c1-40ce-bad9-f44308fdbc79Electronic Thesis or Dissertation |
collection |
NDLTD |
sources |
NDLTD |
topic |
005.3 G000 Computing and Mathematical Sciences |
spellingShingle |
005.3 G000 Computing and Mathematical Sciences Ahmedshareef, Zana Controlling schedule duration during software project execution |
description |
This thesis describes a method of identifying the influences on schedule delays in projects that develop large software systems. Controlling schedule duration is a fundamental aspect of managing projects because of the financial losses associated with late projects. While challenges with controlling software projects have been investigated, there still seemed to be more to be learned about the interplay of a range of factors during project execution and that affect project duration when developing and integrating software systems within enterprise architecture environment. |
author |
Ahmedshareef, Zana |
author_facet |
Ahmedshareef, Zana |
author_sort |
Ahmedshareef, Zana |
title |
Controlling schedule duration during software project execution |
title_short |
Controlling schedule duration during software project execution |
title_full |
Controlling schedule duration during software project execution |
title_fullStr |
Controlling schedule duration during software project execution |
title_full_unstemmed |
Controlling schedule duration during software project execution |
title_sort |
controlling schedule duration during software project execution |
publisher |
University of Brighton |
publishDate |
2015 |
url |
https://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.667851 |
work_keys_str_mv |
AT ahmedshareefzana controllingscheduledurationduringsoftwareprojectexecution |
_version_ |
1718774203554988032 |