11kV cable protection to permit an increase in distributed generation

The UK government have set ambitious targets for future energy supply from renewable energy schemes and combined heating and power plants. In order to meet these targets a large amount of distributed generation is expected to be connected to medium voltage distribution networks. The connection of la...

Full description

Bibliographic Details
Main Author: Chilvers, Ian Michael
Published: University of Manchester 2005
Subjects:
Online Access:http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.595837
id ndltd-bl.uk-oai-ethos.bl.uk-595837
record_format oai_dc
spelling ndltd-bl.uk-oai-ethos.bl.uk-5958372016-06-21T03:25:08Z11kV cable protection to permit an increase in distributed generationChilvers, Ian Michael2005The UK government have set ambitious targets for future energy supply from renewable energy schemes and combined heating and power plants. In order to meet these targets a large amount of distributed generation is expected to be connected to medium voltage distribution networks. The connection of large quantities of distributed generation causes technical problems with existing medium voltage feeder protection schemes. These problems can limit the installed capacity of distributed generation. This work concentrates on the development of an 11kV cable protection scheme in order to minimise or remove the problems with existing cable protection schemes. In the UK, faults on 11kV cable circuits contribute significantly to the total number of customer interruptions. The development of 11kV cable protection can minimise the number of these customer interruptions. This work begins with studies to determine the types of problems encountered with existing 11kV cable protection schemes when distributed generation is connected directly to the 11KV circuit. Based on the results of these studies, the investigation of an 11kV cable protection scheme using distance relays is carried out. In the UK, voltage transformers and communication schemes are seldom installed at 11/0.433 kV distribution substations. The distance relay voltage is measured at the secondary winding of the local 11/0.433 kV distribution transformer, avoiding the cost of installing a voltage transformer at the distribution substation. The performance of the distance scheme is then studied using an electromagnetic transient simulation package. The feasibility and benefits of the new protection scheme are then discussed.621.319University of Manchesterhttp://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.595837Electronic Thesis or Dissertation
collection NDLTD
sources NDLTD
topic 621.319
spellingShingle 621.319
Chilvers, Ian Michael
11kV cable protection to permit an increase in distributed generation
description The UK government have set ambitious targets for future energy supply from renewable energy schemes and combined heating and power plants. In order to meet these targets a large amount of distributed generation is expected to be connected to medium voltage distribution networks. The connection of large quantities of distributed generation causes technical problems with existing medium voltage feeder protection schemes. These problems can limit the installed capacity of distributed generation. This work concentrates on the development of an 11kV cable protection scheme in order to minimise or remove the problems with existing cable protection schemes. In the UK, faults on 11kV cable circuits contribute significantly to the total number of customer interruptions. The development of 11kV cable protection can minimise the number of these customer interruptions. This work begins with studies to determine the types of problems encountered with existing 11kV cable protection schemes when distributed generation is connected directly to the 11KV circuit. Based on the results of these studies, the investigation of an 11kV cable protection scheme using distance relays is carried out. In the UK, voltage transformers and communication schemes are seldom installed at 11/0.433 kV distribution substations. The distance relay voltage is measured at the secondary winding of the local 11/0.433 kV distribution transformer, avoiding the cost of installing a voltage transformer at the distribution substation. The performance of the distance scheme is then studied using an electromagnetic transient simulation package. The feasibility and benefits of the new protection scheme are then discussed.
author Chilvers, Ian Michael
author_facet Chilvers, Ian Michael
author_sort Chilvers, Ian Michael
title 11kV cable protection to permit an increase in distributed generation
title_short 11kV cable protection to permit an increase in distributed generation
title_full 11kV cable protection to permit an increase in distributed generation
title_fullStr 11kV cable protection to permit an increase in distributed generation
title_full_unstemmed 11kV cable protection to permit an increase in distributed generation
title_sort 11kv cable protection to permit an increase in distributed generation
publisher University of Manchester
publishDate 2005
url http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.595837
work_keys_str_mv AT chilversianmichael 11kvcableprotectiontopermitanincreaseindistributedgeneration
_version_ 1718312864934002688