A reenginered model for effective risk management in pre-contractual procurement process for NHS PFI hospitals

This research explores effective management and governance of PFIIPPP projects, and particularly the NHS PFI hospitals, through an appropriate integration of risk management in the pre-contractual procurement process into the proposed reengineered model. A brief review of the literature on general a...

Full description

Bibliographic Details
Main Author: Ghazali, Farid Ezanee Mohamed
Published: University of Leeds 2007
Subjects:
Online Access:http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.589033
id ndltd-bl.uk-oai-ethos.bl.uk-589033
record_format oai_dc
spelling ndltd-bl.uk-oai-ethos.bl.uk-5890332015-03-20T05:07:02ZA reenginered model for effective risk management in pre-contractual procurement process for NHS PFI hospitalsGhazali, Farid Ezanee Mohamed2007This research explores effective management and governance of PFIIPPP projects, and particularly the NHS PFI hospitals, through an appropriate integration of risk management in the pre-contractual procurement process into the proposed reengineered model. A brief review of the literature on general approaches to PFIIPPP in the construction industry and the NHS is undertaken and a more detailed review of the literature on risk classification in PFIIPPP construction projects and the established risk management procedures are presented. A case study is carried out for the purpose of assessing the way the risks have been managed in an actual NHS PFI hospital project. The findings suggest that a lack of knowledge and experience of key personnel within a NHS Trust on PFI transactions and a lack of appropriate risk management guidelines for the PFIIPPP procurement process have lead to some contentious results in the case study. Two initial models have been developed to identify key elements for the pre-contractual procurement process and risk prioritisation of the NHS PFI hospital projects through SADT- IDEFO and AHP techniques respectively. The findings from these models identify gaps in terms of offering effective risk management in the pre-contractual procurement process for PFIIPPP projects and the NHS PFI hospitals in particular. A reengineered model that integrates risk management into the pre-contractual procurement process for effective management and governance of PFIIPPP projects is developed. Key process elements and sub-elements, which need to be carried out systematically when the proposed reengineered model is implemented in the actual construction industry practice, have also been identified in this thesis to ensure a successful VFM delivery of PFIIPPP projects, and particularly the NHS PFI hospitals, with effective risk management. IX362.10680941University of Leedshttp://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.589033Electronic Thesis or Dissertation
collection NDLTD
sources NDLTD
topic 362.10680941
spellingShingle 362.10680941
Ghazali, Farid Ezanee Mohamed
A reenginered model for effective risk management in pre-contractual procurement process for NHS PFI hospitals
description This research explores effective management and governance of PFIIPPP projects, and particularly the NHS PFI hospitals, through an appropriate integration of risk management in the pre-contractual procurement process into the proposed reengineered model. A brief review of the literature on general approaches to PFIIPPP in the construction industry and the NHS is undertaken and a more detailed review of the literature on risk classification in PFIIPPP construction projects and the established risk management procedures are presented. A case study is carried out for the purpose of assessing the way the risks have been managed in an actual NHS PFI hospital project. The findings suggest that a lack of knowledge and experience of key personnel within a NHS Trust on PFI transactions and a lack of appropriate risk management guidelines for the PFIIPPP procurement process have lead to some contentious results in the case study. Two initial models have been developed to identify key elements for the pre-contractual procurement process and risk prioritisation of the NHS PFI hospital projects through SADT- IDEFO and AHP techniques respectively. The findings from these models identify gaps in terms of offering effective risk management in the pre-contractual procurement process for PFIIPPP projects and the NHS PFI hospitals in particular. A reengineered model that integrates risk management into the pre-contractual procurement process for effective management and governance of PFIIPPP projects is developed. Key process elements and sub-elements, which need to be carried out systematically when the proposed reengineered model is implemented in the actual construction industry practice, have also been identified in this thesis to ensure a successful VFM delivery of PFIIPPP projects, and particularly the NHS PFI hospitals, with effective risk management. IX
author Ghazali, Farid Ezanee Mohamed
author_facet Ghazali, Farid Ezanee Mohamed
author_sort Ghazali, Farid Ezanee Mohamed
title A reenginered model for effective risk management in pre-contractual procurement process for NHS PFI hospitals
title_short A reenginered model for effective risk management in pre-contractual procurement process for NHS PFI hospitals
title_full A reenginered model for effective risk management in pre-contractual procurement process for NHS PFI hospitals
title_fullStr A reenginered model for effective risk management in pre-contractual procurement process for NHS PFI hospitals
title_full_unstemmed A reenginered model for effective risk management in pre-contractual procurement process for NHS PFI hospitals
title_sort reenginered model for effective risk management in pre-contractual procurement process for nhs pfi hospitals
publisher University of Leeds
publishDate 2007
url http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.589033
work_keys_str_mv AT ghazalifaridezaneemohamed areengineredmodelforeffectiveriskmanagementinprecontractualprocurementprocessfornhspfihospitals
AT ghazalifaridezaneemohamed reengineredmodelforeffectiveriskmanagementinprecontractualprocurementprocessfornhspfihospitals
_version_ 1716789372728115200