Innovative methodology for location-based scheduling and visualisation of earthworks in road construction projects

This thesis focuses on the development of an innovative location-based scheduling methodology and a computer-based model for improving earthwork operations in road construction projects. Analysis of existing planning and scheduling practices in road construction projects conducted in the course of t...

Full description

Bibliographic Details
Main Author: Shah, Raj K.
Other Authors: Dawood, Nashwan N. : Dean, John T. : Castro, Serafim
Published: Teesside University 2011
Subjects:
Online Access:http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.547294
id ndltd-bl.uk-oai-ethos.bl.uk-547294
record_format oai_dc
spelling ndltd-bl.uk-oai-ethos.bl.uk-5472942015-03-20T04:08:41ZInnovative methodology for location-based scheduling and visualisation of earthworks in road construction projectsShah, Raj K.Dawood, Nashwan N. : Dean, John T. : Castro, Serafim2011This thesis focuses on the development of an innovative location-based scheduling methodology and a computer-based model for improving earthwork operations in road construction projects. Analysis of existing planning and scheduling practices in road construction projects conducted in the course of this research concluded that planning, scheduling and resource allocation are largely dependent on subjective decisions. Also, shortcomings exist due to the distinct characteristics of earthworks, e.g. one-off projects with uncertain site conditions and soil characteristics, causing delays and cost overruns of projects. The literature review found that existing linear scheduling methods provide inaccurate location-based information about earthworks and fail to integrate different productivity rates. A survey was used to capture and analyse industrial practices and issues related to delays and cost overruns. This analysis revealed that the accurate location-based information is vital for efficient resource planning and progress monitoring. Following these findings, a theoretical framework and specification were developed to automate location-based scheduling and visualisation of information. A prototype model was developed by integrating road design data, sectional quantities, productivity rates, unit cost, site access points, and arithmetic algorithms. The algorithms underpinning the model enable the generation of time-location plans automatically as a key output of the model. Weekly progress profiles, space congestion plans, and cost S-curves are the other outputs. A cut-fill algorithm was developed to identify optimum quantities of earthwork and its associated costs. Experiments were conducted with design data provided by a road construction company to demonstrate the model‟s functionality. Sensitivity analysis was used to identify the critical factors relating to earthwork scheduling. It was found that the model is capable of generating time-location plans, considering the critical factors and location aspects. Finally, the model was evaluated using a case study and validated by road construction professionals using an indirect comparison method. It was concluded that the model is a valuable tool for producing location-based scheduling, optimising resource planning and assisting in the communication of scheduling information from the location viewpoints in the earthwork projects.time-space planning : communication of scheduling : cut-fill optimisation : weekly progress profiles : resource planningTeesside Universityhttp://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.547294http://hdl.handle.net/10149/194590Electronic Thesis or Dissertation
collection NDLTD
sources NDLTD
topic time-space planning : communication of scheduling : cut-fill optimisation : weekly progress profiles : resource planning
spellingShingle time-space planning : communication of scheduling : cut-fill optimisation : weekly progress profiles : resource planning
Shah, Raj K.
Innovative methodology for location-based scheduling and visualisation of earthworks in road construction projects
description This thesis focuses on the development of an innovative location-based scheduling methodology and a computer-based model for improving earthwork operations in road construction projects. Analysis of existing planning and scheduling practices in road construction projects conducted in the course of this research concluded that planning, scheduling and resource allocation are largely dependent on subjective decisions. Also, shortcomings exist due to the distinct characteristics of earthworks, e.g. one-off projects with uncertain site conditions and soil characteristics, causing delays and cost overruns of projects. The literature review found that existing linear scheduling methods provide inaccurate location-based information about earthworks and fail to integrate different productivity rates. A survey was used to capture and analyse industrial practices and issues related to delays and cost overruns. This analysis revealed that the accurate location-based information is vital for efficient resource planning and progress monitoring. Following these findings, a theoretical framework and specification were developed to automate location-based scheduling and visualisation of information. A prototype model was developed by integrating road design data, sectional quantities, productivity rates, unit cost, site access points, and arithmetic algorithms. The algorithms underpinning the model enable the generation of time-location plans automatically as a key output of the model. Weekly progress profiles, space congestion plans, and cost S-curves are the other outputs. A cut-fill algorithm was developed to identify optimum quantities of earthwork and its associated costs. Experiments were conducted with design data provided by a road construction company to demonstrate the model‟s functionality. Sensitivity analysis was used to identify the critical factors relating to earthwork scheduling. It was found that the model is capable of generating time-location plans, considering the critical factors and location aspects. Finally, the model was evaluated using a case study and validated by road construction professionals using an indirect comparison method. It was concluded that the model is a valuable tool for producing location-based scheduling, optimising resource planning and assisting in the communication of scheduling information from the location viewpoints in the earthwork projects.
author2 Dawood, Nashwan N. : Dean, John T. : Castro, Serafim
author_facet Dawood, Nashwan N. : Dean, John T. : Castro, Serafim
Shah, Raj K.
author Shah, Raj K.
author_sort Shah, Raj K.
title Innovative methodology for location-based scheduling and visualisation of earthworks in road construction projects
title_short Innovative methodology for location-based scheduling and visualisation of earthworks in road construction projects
title_full Innovative methodology for location-based scheduling and visualisation of earthworks in road construction projects
title_fullStr Innovative methodology for location-based scheduling and visualisation of earthworks in road construction projects
title_full_unstemmed Innovative methodology for location-based scheduling and visualisation of earthworks in road construction projects
title_sort innovative methodology for location-based scheduling and visualisation of earthworks in road construction projects
publisher Teesside University
publishDate 2011
url http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.547294
work_keys_str_mv AT shahrajk innovativemethodologyforlocationbasedschedulingandvisualisationofearthworksinroadconstructionprojects
_version_ 1716784237618659328