Social and technical forces constituting the Silent Valley Reservoir project: Mourne Mountains to Belfast (1893-1932)
Initiated in1923, the Silent Valley Reservoir in the Mourne Mountains was the first large scale civil engineering project after political partition of Ireland. Before being completed the project had to overcome several obstacles. Firstly, the Mourne Mountains were claimed by the Sbuth of Ireland and...
Main Author: | Reinsborough, Michael Tom |
---|---|
Published: |
Queen's University Belfast
2009
|
Subjects: | |
Online Access: | http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.492514 |
Similar Items
Similar Items
-
Reservoir sedimentation and sediment source tracing in a mountainous Mediterranean environment : the Ladonas catchment, Greece
by: Zorzou, Maroulia
Published: (2004) -
Reservoir sedimentation and de-siltation
by: Tolouie, Esmaiel
Published: (1993) -
The Use of Flow Forecasts in Reservoir Operation
by: Russell, S. O.
Published: (1975) -
The deposition of silt in reservoirs by density currents
by: Rad, Manouchehr
Published: (1976) -
Computer aided design and operation of reservoirs
by: Harley, M. J.
Published: (1973)