Railway renewal and maintenance cost estimating

The aim of this thesis is to present a structured methodology which estimates Railway Infrastructure renewal and maintenance costs when there is a lack of quantitative cost data at the early stages of the project life cycle. Furthermore, this thesis presents renewal and maintenance infrastructure co...

Full description

Bibliographic Details
Main Author: Ling, Daniel
Other Authors: Roy, Rajkumar ; Shehab, Essam
Published: Cranfield University 2005
Subjects:
Online Access:http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.485088
id ndltd-bl.uk-oai-ethos.bl.uk-485088
record_format oai_dc
spelling ndltd-bl.uk-oai-ethos.bl.uk-4850882018-05-12T03:23:47ZRailway renewal and maintenance cost estimatingLing, DanielRoy, Rajkumar ; Shehab, Essam2005The aim of this thesis is to present a structured methodology which estimates Railway Infrastructure renewal and maintenance costs when there is a lack of quantitative cost data at the early stages of the project life cycle. Furthermore, this thesis presents renewal and maintenance infrastructure cost estimating issues and investigates current Railway renewal and maintenance cost estimating practice using an industrial case study approach. A flexible design using a case study strategy is described as the most appropriate approach to the successful completion of this study. Industrial case studies using workshops and interview techniques are the primary sources of data whereas literature is used as the secondary sources of data. Following the identification of Railway renewal and maintenance cost estimating issues, a further review of literature leads to the development of a hypothesis. In order to investigate the hypothesis a structured cost estimating methodology is developed which comprises four main stages: creating a project structure that composes the goal, project criteria and alternatives; collecting the necessary data in the form of pairwise comparisons made by a domain expert; producing alternative weights using a geometric mean; and finally employing an algorithmic method using the produced alternative weights and the known cost of one alternative per criteria. The model was implemented within a prototype software tool. This provided a means to validate the proposed model using three industrial case studies. These results provide evidence that the application of a pairwise comparisons based methodology to Railway renewal and maintenance cost estimating problems can provide beneficial. The results indicated that twelve of the fifteen estimates produced by the model were within the expected accuracy and therefore on most occasions prove the hypothesis to be true.625.100681Cranfield Universityhttp://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.485088http://dspace.lib.cranfield.ac.uk/handle/1826/3059Electronic Thesis or Dissertation
collection NDLTD
sources NDLTD
topic 625.100681
spellingShingle 625.100681
Ling, Daniel
Railway renewal and maintenance cost estimating
description The aim of this thesis is to present a structured methodology which estimates Railway Infrastructure renewal and maintenance costs when there is a lack of quantitative cost data at the early stages of the project life cycle. Furthermore, this thesis presents renewal and maintenance infrastructure cost estimating issues and investigates current Railway renewal and maintenance cost estimating practice using an industrial case study approach. A flexible design using a case study strategy is described as the most appropriate approach to the successful completion of this study. Industrial case studies using workshops and interview techniques are the primary sources of data whereas literature is used as the secondary sources of data. Following the identification of Railway renewal and maintenance cost estimating issues, a further review of literature leads to the development of a hypothesis. In order to investigate the hypothesis a structured cost estimating methodology is developed which comprises four main stages: creating a project structure that composes the goal, project criteria and alternatives; collecting the necessary data in the form of pairwise comparisons made by a domain expert; producing alternative weights using a geometric mean; and finally employing an algorithmic method using the produced alternative weights and the known cost of one alternative per criteria. The model was implemented within a prototype software tool. This provided a means to validate the proposed model using three industrial case studies. These results provide evidence that the application of a pairwise comparisons based methodology to Railway renewal and maintenance cost estimating problems can provide beneficial. The results indicated that twelve of the fifteen estimates produced by the model were within the expected accuracy and therefore on most occasions prove the hypothesis to be true.
author2 Roy, Rajkumar ; Shehab, Essam
author_facet Roy, Rajkumar ; Shehab, Essam
Ling, Daniel
author Ling, Daniel
author_sort Ling, Daniel
title Railway renewal and maintenance cost estimating
title_short Railway renewal and maintenance cost estimating
title_full Railway renewal and maintenance cost estimating
title_fullStr Railway renewal and maintenance cost estimating
title_full_unstemmed Railway renewal and maintenance cost estimating
title_sort railway renewal and maintenance cost estimating
publisher Cranfield University
publishDate 2005
url http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.485088
work_keys_str_mv AT lingdaniel railwayrenewalandmaintenancecostestimating
_version_ 1718636806704988160