Shear transfer between precast prestressed bridge beams and in-situ concrete crosshead in continuous structures
A detailed investigation was made to study the shear transfer between precast prestressed beams and in-situ concrete in a relatively new method of construction of continuous bridge decks where the ends of precast beams are connected to an integral in-situ crosshead away from the supports. Two series...
Main Author: | Mirtalaie, Kamal |
---|---|
Other Authors: | Gamble, A. E. |
Published: |
University of Leeds
1988
|
Subjects: | |
Online Access: | http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.383953 |
Similar Items
-
Continuity development between precast beams using prestressed slabs, and its effect on flexure and shear
by: Jayanandana, Aluthjage Don Chandrathilaka
Published: (1989) -
Time-dependent analysis of continuous precast prestressed concrete beams
by: Jaafar, Mohd Saleh
Published: (1999) -
Time-dependant analysis of prestressed concrete segmental bridges
by: Ziadet, G.
Published: (1988) -
Ultimate strength of prestressed concrete beams in shear
by: Schumacher, E. G.
Published: (1961) -
Design and Construction Integration of a Continuous Precast Prestressed Concrete Bridge System
by: Roy, Subha Lakshmi 1982-
Published: (2013)