Practical identification and modelling of a 200 MW boiler turbine generator unit
Main Author: | Boyd, L. F. |
---|---|
Published: |
Queen's University Belfast
1985
|
Subjects: | |
Online Access: | http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.374189 |
Similar Items
-
Identification of large turbogenerator units
by: Swidenbank, E.
Published: (1984) -
Identification of boiler-turbine systems in electric power stations
by: Chawdhry, P. K.
Published: (1985) -
Studies related to the simulation and control of a 200 M.W. generating plant
by: Kwan, H. W.
Published: (1968) -
The effect of unsteady sea conditions on tidal stream turbine loads and durability
by: Nevalainen, Thomas Mikael
Published: (2016) -
Planning generation systems using simulation : the case of Taiwan
by: Chen, Chiung-Yao
Published: (1994)