Setting parameters in MRP for the effective management of bought-out inventory in a JIT assembly environment
In recent years, UK industry has seen an explosive growth in the number of `Computer Aided Production Management' (CAPM) system installations. Of the many CAPM systems, materials requirement planning/manufacturing resource planning (MRP/MRPII) is the most widely implemented. Despite the huge in...
Main Author: | Shah, Sandeep |
---|---|
Published: |
Aston University
1992
|
Subjects: | |
Online Access: | http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.305276 |
Similar Items
-
Effects of visual and 3D sound feedback on assembly task performance in virtual environments
by: Zhang, Ying
Published: (2005) -
A methodology for the concurrent design of products and their assembly sequence
by: Barnes, C. J.
Published: (1999) -
Using parametric sensitivity analysis to detect design intent in CAD assemblies
by: Zubairi, Mohammad Shaheer
Published: (2014) -
The application of time series models in MRP simulation
by: Ip, W. H.
Published: (1993) -
Bridging the gap between business process models and service oriented architectures with reference to the grid environment
by: Khan, Zaheer Abbas
Published: (2009)