Analysis of the State of Practice and Best Practices for Alternative Project Delivery Methods in the Transportation Design and Construction Industry
abstract: Alternative Project Delivery Methods (APDMs), namely Design Build (DB) and Construction Manager at Risk (CMAR), grew out of the need to find a more efficient project delivery approach than the traditional Design Bid Build (DBB) form of delivery. After decades of extensive APDM use, there h...
Other Authors: | Bingham, Evan Dale (Author) |
---|---|
Format: | Doctoral Thesis |
Language: | English |
Published: |
2014
|
Subjects: | |
Online Access: | http://hdl.handle.net/2286/R.I.27405 |
Similar Items
-
Analysis of 2009 ENR Best Projects in Texas to Determine the Impact of Project Delivery System Used
by: Rajan, Navaneethan
Published: (2011) -
Project Delivery Method Performance Evaluation for Water and Wastewater Capital Projects
Published: (2018) -
Innovative Delivery of Water Infrastructure Projects
Published: (2020) -
Performance of the Construction Manager at Risk (CMAR) Delivery Method Applied to Pipeline Construction Projects
Published: (2015) -
Contract Administration Functions and Tools for Design-Build and Construction Manager/General Contractor Project Delivery in U.S. Highway Construction
Published: (2019)