Minimizing Total Weighted Tardiness in a Two Staged Flexible Flow-shop with Batch Processing, Incompatible Job Families and Unequal Ready Times Using Time Window Decomposition
abstract: This research is motivated by a deterministic scheduling problem that is fairly common in manufacturing environments, where there are certain processes that call for a machine working on multiple jobs at the same time. An example of such an environment is wafer fabrication in the semicondu...
Other Authors: | Tewari, Anubha Alokkumar (Author) |
---|---|
Format: | Dissertation |
Language: | English |
Published: |
2012
|
Subjects: | |
Online Access: | http://hdl.handle.net/2286/R.I.15135 |
Similar Items
-
A batch scheduling model for a three-stage flow shop with job and batch processors considering a sampling inspection to minimize expected total actual flow time
by: Pratya Poeri Suryadhini, et al.
Published: (2021-06-01) -
Multi-items Batch Scheduling Model for a Batch Processor to Minimize Total Actual Flow Time of Parts through the Shop
by: Nita P.A Hidayat, et al.
Published: (2018-06-01) -
A flow shop batch scheduling and operator assignment model with time-changing effects of learning and forgetting to minimize total actual flow time
by: Dwi Kurniawan, et al.
Published: (2020-11-01) -
Optimization of an integrated batch production and maintenance scheduling on flow shop with two machines
by: Zahedi Zahedi, et al.
Published: (2018-10-01) -
Minimizing Makespan for Hybrid Flowshops with Batch, Discrete Processing Machines and Arbitrary Job Sizes
by: Zheng, Yanming
Published: (2010)