Minimizing Total Weighted Tardiness in a Two Staged Flexible Flow-shop with Batch Processing, Incompatible Job Families and Unequal Ready Times Using Time Window Decomposition

abstract: This research is motivated by a deterministic scheduling problem that is fairly common in manufacturing environments, where there are certain processes that call for a machine working on multiple jobs at the same time. An example of such an environment is wafer fabrication in the semicondu...

Full description

Bibliographic Details
Other Authors: Tewari, Anubha Alokkumar (Author)
Format: Dissertation
Language:English
Published: 2012
Subjects:
Online Access:http://hdl.handle.net/2286/R.I.15135