Low-cost, short-term development or high-data-rate, multi-stream, mulit-data type telemetry acquisition/processing system using an off-the-shelf integrated Telemetry Front End.

International Telemetering Conference Proceedings / October 30-November 02, 1989 / Town & Country Hotel & Convention Center, San Diego, California === This paper explores the effects the new breed of off-theshelf integrated telemetry front end (TFE) packages have on the cost and schedule of...

Full description

Bibliographic Details
Main Authors: Carter, Bruce, Scoughton, Troy
Other Authors: New Mexico State University
Language:en_US
Published: International Foundation for Telemetering 1989
Online Access:http://hdl.handle.net/10150/614541
http://arizona.openrepository.com/arizona/handle/10150/614541
id ndltd-arizona.edu-oai-arizona.openrepository.com-10150-614541
record_format oai_dc
spelling ndltd-arizona.edu-oai-arizona.openrepository.com-10150-6145412016-06-25T03:01:05Z Low-cost, short-term development or high-data-rate, multi-stream, mulit-data type telemetry acquisition/processing system using an off-the-shelf integrated Telemetry Front End. Carter, Bruce Scoughton, Troy New Mexico State University International Telemetering Conference Proceedings / October 30-November 02, 1989 / Town & Country Hotel & Convention Center, San Diego, California This paper explores the effects the new breed of off-theshelf integrated telemetry front end (TFE) packages have on the cost and schedule of the development cycle associated with real-time telemetry acquisition/processing systems. A case study of an actual project involving replacement of the Holloman AFB sled track telemetry processing system (TPS) with a system capable of simultaneously supporting up to twenty (20) asynchronous data streams is profiled. Notable among the capabilities of the system are; support for PCM, PAM, FM, IRIG and Local time streams; incoming data rates up to 10 Megabits/sec/stream; data logging rates over 16 MegaBytes/sec and the use of local area networks for distribution of data to real-time displays. To achieve these requirements within a manageable cost/schedule framework, the system was designed around an integrated TFE sub-system. Comparisons are drawn between several aspects of this projects development and that of an earlier developmental system which was completed by PSL within the last 16 months. 1989-11 text Proceedings 0884-5123 0074-9079 http://hdl.handle.net/10150/614541 http://arizona.openrepository.com/arizona/handle/10150/614541 International Telemetering Conference Proceedings en_US http://www.telemetry.org/ Copyright © International Foundation for Telemetering International Foundation for Telemetering
collection NDLTD
language en_US
sources NDLTD
description International Telemetering Conference Proceedings / October 30-November 02, 1989 / Town & Country Hotel & Convention Center, San Diego, California === This paper explores the effects the new breed of off-theshelf integrated telemetry front end (TFE) packages have on the cost and schedule of the development cycle associated with real-time telemetry acquisition/processing systems. A case study of an actual project involving replacement of the Holloman AFB sled track telemetry processing system (TPS) with a system capable of simultaneously supporting up to twenty (20) asynchronous data streams is profiled. Notable among the capabilities of the system are; support for PCM, PAM, FM, IRIG and Local time streams; incoming data rates up to 10 Megabits/sec/stream; data logging rates over 16 MegaBytes/sec and the use of local area networks for distribution of data to real-time displays. To achieve these requirements within a manageable cost/schedule framework, the system was designed around an integrated TFE sub-system. Comparisons are drawn between several aspects of this projects development and that of an earlier developmental system which was completed by PSL within the last 16 months.
author2 New Mexico State University
author_facet New Mexico State University
Carter, Bruce
Scoughton, Troy
author Carter, Bruce
Scoughton, Troy
spellingShingle Carter, Bruce
Scoughton, Troy
Low-cost, short-term development or high-data-rate, multi-stream, mulit-data type telemetry acquisition/processing system using an off-the-shelf integrated Telemetry Front End.
author_sort Carter, Bruce
title Low-cost, short-term development or high-data-rate, multi-stream, mulit-data type telemetry acquisition/processing system using an off-the-shelf integrated Telemetry Front End.
title_short Low-cost, short-term development or high-data-rate, multi-stream, mulit-data type telemetry acquisition/processing system using an off-the-shelf integrated Telemetry Front End.
title_full Low-cost, short-term development or high-data-rate, multi-stream, mulit-data type telemetry acquisition/processing system using an off-the-shelf integrated Telemetry Front End.
title_fullStr Low-cost, short-term development or high-data-rate, multi-stream, mulit-data type telemetry acquisition/processing system using an off-the-shelf integrated Telemetry Front End.
title_full_unstemmed Low-cost, short-term development or high-data-rate, multi-stream, mulit-data type telemetry acquisition/processing system using an off-the-shelf integrated Telemetry Front End.
title_sort low-cost, short-term development or high-data-rate, multi-stream, mulit-data type telemetry acquisition/processing system using an off-the-shelf integrated telemetry front end.
publisher International Foundation for Telemetering
publishDate 1989
url http://hdl.handle.net/10150/614541
http://arizona.openrepository.com/arizona/handle/10150/614541
work_keys_str_mv AT carterbruce lowcostshorttermdevelopmentorhighdataratemultistreammulitdatatypetelemetryacquisitionprocessingsystemusinganofftheshelfintegratedtelemetryfrontend
AT scoughtontroy lowcostshorttermdevelopmentorhighdataratemultistreammulitdatatypetelemetryacquisitionprocessingsystemusinganofftheshelfintegratedtelemetryfrontend
_version_ 1718323726292877312