VERIFICATION AND VALIDATION OF CONTROL CENTER OPERATIONS USING A TELEMETRY SIMULATION
International Telemetering Conference Proceedings / October 17-20, 1994 / Town & Country Hotel and Conference Center, San Diego, California === In space applications, telemetry systems are traditionally used to provide a front end for processing Control Center data. Control Center operations di...
Main Authors: | , , |
---|---|
Other Authors: | |
Language: | en_US |
Published: |
International Foundation for Telemetering
1994
|
Subjects: | |
Online Access: | http://hdl.handle.net/10150/608594 http://arizona.openrepository.com/arizona/handle/10150/608594 |
Summary: | International Telemetering Conference Proceedings / October 17-20, 1994 / Town & Country Hotel and Conference Center, San Diego, California === In space applications, telemetry systems are traditionally used to provide a front end
for processing Control Center data. Control Center operations dictate the content and
processing requirements of the telemetry data to enable the control center personnel to
make proper decisions concerning the operation of their space vehicle. Unfortunately
many anomalous operational scenarios do not arise during control center checkout
procedures which are designed to test the functionality of the Control Center
equipment. However, an interactive telemetry simulation, which involves producing
telemetry data using real-world formats and data rates, can create many of the
situations control center personnel may encounter. A host computer is used to drive a
telemetry system which in turn produces simulated vehicle data. As a result, a
telemetry simulation can not only verify the functionality of the Control Center
hardware and software, but also validate Control Center procedures and train Control
Center personnel in the process. |
---|