AIRBUS Generic Flight Test Installation
ITC/USA 2011 Conference Proceedings / The Forty-Seventh Annual International Telemetering Conference and Technical Exhibition / October 24-27, 2011 / Bally's Las Vegas, Las Vegas, Nevada === This paper describes new concepts of test mean and processes to perform flight test for all Airbus aircr...
Main Author: | |
---|---|
Other Authors: | |
Language: | en_US |
Published: |
International Foundation for Telemetering
2011
|
Subjects: | |
Online Access: | http://hdl.handle.net/10150/595663 |
id |
ndltd-arizona.edu-oai-arizona.openrepository.com-10150-595663 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-arizona.edu-oai-arizona.openrepository.com-10150-5956632016-02-06T03:00:49Z AIRBUS Generic Flight Test Installation Caturla, Jean-Pascal AIRBUS Operations SAS GENETI(Generic Flight test installation) Aircraft deliveries PATM (Production Aircraft Test Manual) CAM (Customer Acceptance Manual) FTI (Flight Test Installation) PATS(Production Aircraft Test System) DATS (Development Aircraft Test System) SA (Single Aisle) LR (Long Range) DD (Double Deck) FTE(Flight Test Engineer) FTES (Flight Test Engineer Station) ITC/USA 2011 Conference Proceedings / The Forty-Seventh Annual International Telemetering Conference and Technical Exhibition / October 24-27, 2011 / Bally's Las Vegas, Las Vegas, Nevada This paper describes new concepts of test mean and processes to perform flight test for all Airbus aircraft family. The FTI (Flight Test Installation) designed for A320, A340, A380 and A350 programs include acquisition system, recorder, data processing, visualisation, Flight Test Engineer Station and optional functionalities (video acquisition, DGPS, telemetry ...) In the past, these test means were specific for each test aircraft. Due to the large number of Aircraft development in parallel Airbus has designed and standardized new tests means for development and production aircraft. The first goal is to generate significant benefits regarding time and costs savings by simplifying installation and reusing all the test installations components. This paper shows the opportunities and challenges of these new concepts. 2011-10 text Proceedings 0884-5123 0074-9079 http://hdl.handle.net/10150/595663 International Telemetering Conference Proceedings en_US http://www.telemetry.org/ Copyright © held by the author; distribution rights International Foundation for Telemetering International Foundation for Telemetering |
collection |
NDLTD |
language |
en_US |
sources |
NDLTD |
topic |
GENETI(Generic Flight test installation) Aircraft deliveries PATM (Production Aircraft Test Manual) CAM (Customer Acceptance Manual) FTI (Flight Test Installation) PATS(Production Aircraft Test System) DATS (Development Aircraft Test System) SA (Single Aisle) LR (Long Range) DD (Double Deck) FTE(Flight Test Engineer) FTES (Flight Test Engineer Station) |
spellingShingle |
GENETI(Generic Flight test installation) Aircraft deliveries PATM (Production Aircraft Test Manual) CAM (Customer Acceptance Manual) FTI (Flight Test Installation) PATS(Production Aircraft Test System) DATS (Development Aircraft Test System) SA (Single Aisle) LR (Long Range) DD (Double Deck) FTE(Flight Test Engineer) FTES (Flight Test Engineer Station) Caturla, Jean-Pascal AIRBUS Generic Flight Test Installation |
description |
ITC/USA 2011 Conference Proceedings / The Forty-Seventh Annual International Telemetering Conference and Technical Exhibition / October 24-27, 2011 / Bally's Las Vegas, Las Vegas, Nevada === This paper describes new concepts of test mean and processes to perform flight test for all Airbus aircraft family. The FTI (Flight Test Installation) designed for A320, A340, A380 and A350 programs include acquisition system, recorder, data processing, visualisation, Flight Test Engineer Station and optional functionalities (video acquisition, DGPS, telemetry ...) In the past, these test means were specific for each test aircraft. Due to the large number of Aircraft development in parallel Airbus has designed and standardized new tests means for development and production aircraft. The first goal is to generate significant benefits regarding time and costs savings by simplifying installation and reusing all the test installations components. This paper shows the opportunities and challenges of these new concepts. |
author2 |
AIRBUS Operations SAS |
author_facet |
AIRBUS Operations SAS Caturla, Jean-Pascal |
author |
Caturla, Jean-Pascal |
author_sort |
Caturla, Jean-Pascal |
title |
AIRBUS Generic Flight Test Installation |
title_short |
AIRBUS Generic Flight Test Installation |
title_full |
AIRBUS Generic Flight Test Installation |
title_fullStr |
AIRBUS Generic Flight Test Installation |
title_full_unstemmed |
AIRBUS Generic Flight Test Installation |
title_sort |
airbus generic flight test installation |
publisher |
International Foundation for Telemetering |
publishDate |
2011 |
url |
http://hdl.handle.net/10150/595663 |
work_keys_str_mv |
AT caturlajeanpascal airbusgenericflighttestinstallation |
_version_ |
1718181948468232192 |