ZERO-ONE PROGRAMMING ANALYSIS OF MINE PRODUCTION SCHEDULING PROBLEMS.
Main Author: | |
---|---|
Language: | en_US |
Published: |
The University of Arizona.
1985
|
Subjects: | |
Online Access: | http://hdl.handle.net/10150/275401 |
id |
ndltd-arizona.edu-oai-arizona.openrepository.com-10150-275401 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-arizona.edu-oai-arizona.openrepository.com-10150-2754012015-10-23T05:01:10Z ZERO-ONE PROGRAMMING ANALYSIS OF MINE PRODUCTION SCHEDULING PROBLEMS. Cai, Wenlong. Mines and mineral resources -- Production control. Mines and mineral resources -- Automation. 1985 text Thesis-Reproduction (electronic) http://hdl.handle.net/10150/275401 14079189 1326693 .b15672244 en_US Copyright © is held by the author. Digital access to this material is made possible by the University Libraries, University of Arizona. Further transmission, reproduction or presentation (such as public display or performance) of protected items is prohibited except with permission of the author. The University of Arizona. |
collection |
NDLTD |
language |
en_US |
sources |
NDLTD |
topic |
Mines and mineral resources -- Production control. Mines and mineral resources -- Automation. |
spellingShingle |
Mines and mineral resources -- Production control. Mines and mineral resources -- Automation. Cai, Wenlong. ZERO-ONE PROGRAMMING ANALYSIS OF MINE PRODUCTION SCHEDULING PROBLEMS. |
author |
Cai, Wenlong. |
author_facet |
Cai, Wenlong. |
author_sort |
Cai, Wenlong. |
title |
ZERO-ONE PROGRAMMING ANALYSIS OF MINE PRODUCTION SCHEDULING PROBLEMS. |
title_short |
ZERO-ONE PROGRAMMING ANALYSIS OF MINE PRODUCTION SCHEDULING PROBLEMS. |
title_full |
ZERO-ONE PROGRAMMING ANALYSIS OF MINE PRODUCTION SCHEDULING PROBLEMS. |
title_fullStr |
ZERO-ONE PROGRAMMING ANALYSIS OF MINE PRODUCTION SCHEDULING PROBLEMS. |
title_full_unstemmed |
ZERO-ONE PROGRAMMING ANALYSIS OF MINE PRODUCTION SCHEDULING PROBLEMS. |
title_sort |
zero-one programming analysis of mine production scheduling problems. |
publisher |
The University of Arizona. |
publishDate |
1985 |
url |
http://hdl.handle.net/10150/275401 |
work_keys_str_mv |
AT caiwenlong zerooneprogramminganalysisofmineproductionschedulingproblems |
_version_ |
1718102192920985600 |