Operation plan of the Wonogiri Reservoir, Central Java, Indonesia
The feasibility study estimated that the Wonogiri Reservoir will be able to supply water with a 90 percent reliability. This estimation was supplied by frequency analysis. Twenty years of monthly streamflow data of the Solo River were used in these calculations. The current study estimates a 5.82 pe...
Main Author: | Sutadi, Graita. |
---|---|
Other Authors: | Ince, Simon |
Language: | en |
Published: |
The University of Arizona.
1982
|
Online Access: | http://hdl.handle.net/10150/191763 |
Similar Items
-
Spatial and temporal description of water pollution status of Gajah Mungkur Reservoir Wonogiri, Central Java, Indonesia
by: WIRYANTO
Published: (2017-03-01) -
Analysis of Piping at Kedung Uling Earthfill Dam, Wonogiri Regency, Central Java Province, Indonesia
by: Najib, et al.
Published: (2018-01-01) -
Disposal Site Selection Using TOPSIS in Wonogiri District Central Java
by: Much. Djunaidi, et al.
Published: (2018-07-01) -
Analysis of Sedimentation in Wonogiri Reservoir
by: Tri Joko Inti Budi Santosa
Published: (2016-01-01) -
Land Capability in Gobeh Sub Watershed Wonogiry Regency Central Java Province
by: Taryono Taryono
Published: (2004-01-01)