Improved Schedule Analysis Considering Rework Impact and Optimum Delay Mitigation
Rework has been a primary cause of cost and schedule overruns in the construction of heavy industrial projects such as those related to oil and gas. It has been reported that the direct cost of rework is about 5% of total construction costs. Several research studies have analyzed the causes and effe...
Main Author: | Said, Mohamed |
---|---|
Language: | en |
Published: |
2009
|
Subjects: | |
Online Access: | http://hdl.handle.net/10012/4866 |
Similar Items
-
Improved Schedule Analysis Considering Rework Impact and Optimum Delay Mitigation
by: Said, Mohamed
Published: (2009) -
Analysis of rework causes in infrastructure projects in pulau pinang
by: Dollah, Z., et al.
Published: (2021) -
Factors causing rework and their impact on projects’ performance in Egypt
by: Assim Muwafaq Al-Janabi, et al.
Published: (2020-08-01) -
Analysis of a Construction Small-Projects Rework Reduction Program for a Capital Facility
by: Zhang, Di
Published: (2010) -
Analysis of a Construction Small-Projects Rework Reduction Program for a Capital Facility
by: Zhang, Di
Published: (2010)