The use of portfolio management with target costed process oriented products under conditions of uncertainty
The present trend towards shorter product lives means that manufacturers are faced with less time whereby production costs can be controlled and reduced. As a result many companies are turning towards the use of Systems Engineering and cost management techniques that are intended to reduce product c...
Main Author: | |
---|---|
Other Authors: | |
Format: | Dissertation |
Published: |
Virginia Tech
2014
|
Subjects: | |
Online Access: | http://hdl.handle.net/10919/40902 http://scholar.lib.vt.edu/theses/available/etd-02022010-020227/ |
id |
ndltd-VTETD-oai-vtechworks.lib.vt.edu-10919-40902 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-VTETD-oai-vtechworks.lib.vt.edu-10919-409022020-06-13T15:33:01Z The use of portfolio management with target costed process oriented products under conditions of uncertainty Horton, Kevin G. Systems Engineering Sullivan, William G. Blanchard, Benjamin S. Jr. Reasor, Roderick J. efficient portfolios quadratic programming continuous products target costing LD5655.V851 1995.H678 The present trend towards shorter product lives means that manufacturers are faced with less time whereby production costs can be controlled and reduced. As a result many companies are turning towards the use of Systems Engineering and cost management techniques that are intended to reduce product costs during the design phases of the product life. <p>One of the many cost management tools that are presently in use is target costing. An iterative process, target costing attempts to reduce the cost of manufacturing products by using value engineering techniques so that identified target costs can be realized. As a step improvement program, the ability of a company to obtain its target cost in not always certain. Target profits from individual products are grouped together into portfolios and then managed according to company strategic profit plans. <p>This report investigates methods used for identifying the uncertainties that can exist in the target costing process and suggests the potential use efficient portfolio techniques for the management of process oriented or continuous products. The report also suggests a number of follow-on projects that could encompass the use of specific decision support systems for the examination of both target costing uncertainties and portfolio management. Master of Science 2014-03-14T21:28:21Z 2014-03-14T21:28:21Z 1995-08-05 2010-02-02 2010-02-02 2010-02-02 Master's project etd-02022010-020227 http://hdl.handle.net/10919/40902 http://scholar.lib.vt.edu/theses/available/etd-02022010-020227/ LD5655.V851_1995.H678.pdf BTD application/pdf Virginia Tech |
collection |
NDLTD |
format |
Dissertation |
sources |
NDLTD |
topic |
efficient portfolios quadratic programming continuous products target costing LD5655.V851 1995.H678 |
spellingShingle |
efficient portfolios quadratic programming continuous products target costing LD5655.V851 1995.H678 Horton, Kevin G. The use of portfolio management with target costed process oriented products under conditions of uncertainty |
description |
The present trend towards shorter product lives means that manufacturers are
faced with less time whereby production costs can be controlled and reduced. As a result
many companies are turning towards the use of Systems Engineering and cost
management techniques that are intended to reduce product costs during the design phases
of the product life.
<p>One of the many cost management tools that are presently in use is target costing.
An iterative process, target costing attempts to reduce the cost of manufacturing products
by using value engineering techniques so that identified target costs can be realized. As a
step improvement program, the ability of a company to obtain its target cost in not always
certain. Target profits from individual products are grouped together into portfolios and
then managed according to company strategic profit plans.
<p>This report investigates methods used for identifying the uncertainties that can
exist in the target costing process and suggests the potential use efficient portfolio
techniques for the management of process oriented or continuous products.
The report also suggests a number of follow-on projects that could encompass the
use of specific decision support systems for the examination of both target costing
uncertainties and portfolio management. === Master of Science |
author2 |
Systems Engineering |
author_facet |
Systems Engineering Horton, Kevin G. |
author |
Horton, Kevin G. |
author_sort |
Horton, Kevin G. |
title |
The use of portfolio management with target costed process oriented products under conditions of uncertainty |
title_short |
The use of portfolio management with target costed process oriented products under conditions of uncertainty |
title_full |
The use of portfolio management with target costed process oriented products under conditions of uncertainty |
title_fullStr |
The use of portfolio management with target costed process oriented products under conditions of uncertainty |
title_full_unstemmed |
The use of portfolio management with target costed process oriented products under conditions of uncertainty |
title_sort |
use of portfolio management with target costed process oriented products under conditions of uncertainty |
publisher |
Virginia Tech |
publishDate |
2014 |
url |
http://hdl.handle.net/10919/40902 http://scholar.lib.vt.edu/theses/available/etd-02022010-020227/ |
work_keys_str_mv |
AT hortonkeving theuseofportfoliomanagementwithtargetcostedprocessorientedproductsunderconditionsofuncertainty AT hortonkeving useofportfoliomanagementwithtargetcostedprocessorientedproductsunderconditionsofuncertainty |
_version_ |
1719319689250734080 |