The use of portfolio management with target costed process oriented products under conditions of uncertainty

The present trend towards shorter product lives means that manufacturers are faced with less time whereby production costs can be controlled and reduced. As a result many companies are turning towards the use of Systems Engineering and cost management techniques that are intended to reduce product c...

Full description

Bibliographic Details
Main Author: Horton, Kevin G.
Other Authors: Systems Engineering
Format: Dissertation
Published: Virginia Tech 2014
Subjects:
Online Access:http://hdl.handle.net/10919/40902
http://scholar.lib.vt.edu/theses/available/etd-02022010-020227/
id ndltd-VTETD-oai-vtechworks.lib.vt.edu-10919-40902
record_format oai_dc
spelling ndltd-VTETD-oai-vtechworks.lib.vt.edu-10919-409022020-06-13T15:33:01Z The use of portfolio management with target costed process oriented products under conditions of uncertainty Horton, Kevin G. Systems Engineering Sullivan, William G. Blanchard, Benjamin S. Jr. Reasor, Roderick J. efficient portfolios quadratic programming continuous products target costing LD5655.V851 1995.H678 The present trend towards shorter product lives means that manufacturers are faced with less time whereby production costs can be controlled and reduced. As a result many companies are turning towards the use of Systems Engineering and cost management techniques that are intended to reduce product costs during the design phases of the product life. <p>One of the many cost management tools that are presently in use is target costing. An iterative process, target costing attempts to reduce the cost of manufacturing products by using value engineering techniques so that identified target costs can be realized. As a step improvement program, the ability of a company to obtain its target cost in not always certain. Target profits from individual products are grouped together into portfolios and then managed according to company strategic profit plans. <p>This report investigates methods used for identifying the uncertainties that can exist in the target costing process and suggests the potential use efficient portfolio techniques for the management of process oriented or continuous products. The report also suggests a number of follow-on projects that could encompass the use of specific decision support systems for the examination of both target costing uncertainties and portfolio management. Master of Science 2014-03-14T21:28:21Z 2014-03-14T21:28:21Z 1995-08-05 2010-02-02 2010-02-02 2010-02-02 Master's project etd-02022010-020227 http://hdl.handle.net/10919/40902 http://scholar.lib.vt.edu/theses/available/etd-02022010-020227/ LD5655.V851_1995.H678.pdf BTD application/pdf Virginia Tech
collection NDLTD
format Dissertation
sources NDLTD
topic efficient portfolios
quadratic programming
continuous products
target costing
LD5655.V851 1995.H678
spellingShingle efficient portfolios
quadratic programming
continuous products
target costing
LD5655.V851 1995.H678
Horton, Kevin G.
The use of portfolio management with target costed process oriented products under conditions of uncertainty
description The present trend towards shorter product lives means that manufacturers are faced with less time whereby production costs can be controlled and reduced. As a result many companies are turning towards the use of Systems Engineering and cost management techniques that are intended to reduce product costs during the design phases of the product life. <p>One of the many cost management tools that are presently in use is target costing. An iterative process, target costing attempts to reduce the cost of manufacturing products by using value engineering techniques so that identified target costs can be realized. As a step improvement program, the ability of a company to obtain its target cost in not always certain. Target profits from individual products are grouped together into portfolios and then managed according to company strategic profit plans. <p>This report investigates methods used for identifying the uncertainties that can exist in the target costing process and suggests the potential use efficient portfolio techniques for the management of process oriented or continuous products. The report also suggests a number of follow-on projects that could encompass the use of specific decision support systems for the examination of both target costing uncertainties and portfolio management. === Master of Science
author2 Systems Engineering
author_facet Systems Engineering
Horton, Kevin G.
author Horton, Kevin G.
author_sort Horton, Kevin G.
title The use of portfolio management with target costed process oriented products under conditions of uncertainty
title_short The use of portfolio management with target costed process oriented products under conditions of uncertainty
title_full The use of portfolio management with target costed process oriented products under conditions of uncertainty
title_fullStr The use of portfolio management with target costed process oriented products under conditions of uncertainty
title_full_unstemmed The use of portfolio management with target costed process oriented products under conditions of uncertainty
title_sort use of portfolio management with target costed process oriented products under conditions of uncertainty
publisher Virginia Tech
publishDate 2014
url http://hdl.handle.net/10919/40902
http://scholar.lib.vt.edu/theses/available/etd-02022010-020227/
work_keys_str_mv AT hortonkeving theuseofportfoliomanagementwithtargetcostedprocessorientedproductsunderconditionsofuncertainty
AT hortonkeving useofportfoliomanagementwithtargetcostedprocessorientedproductsunderconditionsofuncertainty
_version_ 1719319689250734080