Evaluation of oxygen uptake rate as an activated sludge process control parameter

A debate currently exists concerning whether or not oxygen uptake rate is a valid control parameter for monitoring the activated sludge process. A laboratory study was conducted to attempt to shed light on the controversy. Two bench-scale reactors were operated at steady state and under shock load....

Full description

Bibliographic Details
Main Author: Chandra, Sanjay
Other Authors: Environmental Engineering
Format: Others
Language:en
Published: Virginia Polytechnic Institute and State University 2020
Subjects:
Online Access:http://hdl.handle.net/10919/101173
id ndltd-VTETD-oai-vtechworks.lib.vt.edu-10919-101173
record_format oai_dc
spelling ndltd-VTETD-oai-vtechworks.lib.vt.edu-10919-1011732021-01-13T05:33:48Z Evaluation of oxygen uptake rate as an activated sludge process control parameter Chandra, Sanjay Environmental Engineering LD5655.V855 1987.C529 Oxygen -- Industrial applications Sewage -- Activated sludge process Sewage -- Purification -- Biological treatment A debate currently exists concerning whether or not oxygen uptake rate is a valid control parameter for monitoring the activated sludge process. A laboratory study was conducted to attempt to shed light on the controversy. Two bench-scale reactors were operated at steady state and under shock load. Oxygen uptake rate (OUR) was measured with the BOD bottle technique and with an on-line respirometer. The reliability of the results obtained from the BOD bottle technique was also of interest. No relationship could be deduced between effluent quality and oxygen uptake rate thereby suggesting that the latter would not be useful as a control parameter. As was concluded from the shock load data, the oxygen uptake rate varies very inconsistently at high organic loadings. It was found that the BOD bottle technique completely failed at very high organic loadings and gave meaningless results. The on-line respirometer, in spite of its high sensitivity, gave more realistic and consistent results. M.S. 2020-12-14T16:34:42Z 2020-12-14T16:34:42Z 1987 Thesis Text http://hdl.handle.net/10919/101173 en OCLC# 16369408 In Copyright http://rightsstatements.org/vocab/InC/1.0/ vi, 60 leaves application/pdf application/pdf Virginia Polytechnic Institute and State University
collection NDLTD
language en
format Others
sources NDLTD
topic LD5655.V855 1987.C529
Oxygen -- Industrial applications
Sewage -- Activated sludge process
Sewage -- Purification -- Biological treatment
spellingShingle LD5655.V855 1987.C529
Oxygen -- Industrial applications
Sewage -- Activated sludge process
Sewage -- Purification -- Biological treatment
Chandra, Sanjay
Evaluation of oxygen uptake rate as an activated sludge process control parameter
description A debate currently exists concerning whether or not oxygen uptake rate is a valid control parameter for monitoring the activated sludge process. A laboratory study was conducted to attempt to shed light on the controversy. Two bench-scale reactors were operated at steady state and under shock load. Oxygen uptake rate (OUR) was measured with the BOD bottle technique and with an on-line respirometer. The reliability of the results obtained from the BOD bottle technique was also of interest. No relationship could be deduced between effluent quality and oxygen uptake rate thereby suggesting that the latter would not be useful as a control parameter. As was concluded from the shock load data, the oxygen uptake rate varies very inconsistently at high organic loadings. It was found that the BOD bottle technique completely failed at very high organic loadings and gave meaningless results. The on-line respirometer, in spite of its high sensitivity, gave more realistic and consistent results. === M.S.
author2 Environmental Engineering
author_facet Environmental Engineering
Chandra, Sanjay
author Chandra, Sanjay
author_sort Chandra, Sanjay
title Evaluation of oxygen uptake rate as an activated sludge process control parameter
title_short Evaluation of oxygen uptake rate as an activated sludge process control parameter
title_full Evaluation of oxygen uptake rate as an activated sludge process control parameter
title_fullStr Evaluation of oxygen uptake rate as an activated sludge process control parameter
title_full_unstemmed Evaluation of oxygen uptake rate as an activated sludge process control parameter
title_sort evaluation of oxygen uptake rate as an activated sludge process control parameter
publisher Virginia Polytechnic Institute and State University
publishDate 2020
url http://hdl.handle.net/10919/101173
work_keys_str_mv AT chandrasanjay evaluationofoxygenuptakerateasanactivatedsludgeprocesscontrolparameter
_version_ 1719372633261211648