Potential and Quantification of Street Sweeping Pollutant Reductions towards addressing TMDL WLAs for MS4 Compliance
Municipal separate storm sewer system (MS4) permittees face costly obligations to reduce pollutant loadings needed to achieve waste load allocations (WLAs) and meet total maximum daily loads (TMDLs). Street sweeping is potentially an effective BMP since streets exist throughout urban watersheds, oft...
Main Author: | Hixon, Lee Franklin |
---|---|
Other Authors: | Civil and Environmental Engineering |
Format: | Others |
Language: | en |
Published: |
Virginia Tech
2020
|
Subjects: | |
Online Access: | http://hdl.handle.net/10919/100955 |
Similar Items
-
Factors Influencing the Amount of Time Spent By Cattle In Streams: Implications for TMDL Development
by: Masters, Amanda Lynn
Published: (2014) -
Comparison Watershed Selection When Applying the AllForX Approach for Sediment TMDL Development
by: Bronnenkant, Kristine Nicole
Published: (2014) -
Examining the Influence of Wildlife Population and Fecal Coliform Density Variability on Virginia Bacterial TMDL Development
by: Tse, Wesley Chi-Kon
Published: (2015) -
Bacterial total maximum daily load (TMDL): development and evaluation of a new classification scheme for impaired waterbodies of Texas
by: Paul, Sabu
Published: (2005) -
Assessing the effectiveness of the Neuse nitrogen TMDL program and its impacts on estuarine chlorophyll dynamics
by: Alameddine, Ibrahim
Published: (2011)