Improving Stability by Enhancing Critical Fault Clearing Time

The Bulk Electric System (BES) in the United States includes transmission lines of 100kV and above, transformers of 100kV and above on Low Voltage (LV) side and generating units that step up to 100 kV and above. The BES is a power network that connects different states and utility companies via tie...

Full description

Bibliographic Details
Main Author: Ghani, Ammara M.
Format: Others
Published: Scholar Commons 2019
Subjects:
Online Access:https://scholarcommons.usf.edu/etd/7793
https://scholarcommons.usf.edu/cgi/viewcontent.cgi?article=8990&context=etd

Similar Items