The basic objective in bulk electrical system planning is to determine the necessary generating facilities required to ensure an adequate and economic supply of electrical energy and the development of an adequate transmission network to transport the generated energy to the customers. Quantitative...

Full description

Bibliographic Details
Main Author: Vega Hernandez, Nahun Bulmaro
Other Authors: Karki, Rajesh
Format: Others
Language:en
Published: University of Saskatchewan 2009
Subjects:
Online Access:http://library.usask.ca/theses/available/etd-04012009-181008/
id ndltd-USASK-oai-usask.ca-etd-04012009-181008
record_format oai_dc
spelling ndltd-USASK-oai-usask.ca-etd-04012009-1810082013-01-08T16:33:47Z Load forecast uncertainty considerations in bulk electrical system adequacy assessment Vega Hernandez, Nahun Bulmaro load bus priority order uncertainty of future system requirements methods to forecast energy demand system development and reinforcement planning recognition of load uncertainty The basic objective in bulk electrical system planning is to determine the necessary generating facilities required to ensure an adequate and economic supply of electrical energy and the development of an adequate transmission network to transport the generated energy to the customers. Quantitative adequacy assessment is a basic task in achieving this objective. An important requirement in this task is the ability to forecast the system load requirements at specific times in the future. These forecasts must also recognize the inherent uncertainty in predicting the future load demands.<p> The primary focus of the research described in this thesis is to examine the effects and implications of load forecast uncertainty on the load point and system adequacy indices of a composite generation and transmission system. This thesis considers two techniques to incorporate the inherent uncertainty associated with future load forecasts in the adequacy assessment of bulk electrical systems. Base case and factor analyses are performed on a number of power system configurations to identify and address the relative contributions to the load point and system indices due to load forecast uncertainty. A transmission reinforcement option and a number of generation system expansion options are presented to examine the system reliability response due to load forecast uncertainty.<p> The actual magnitudes of the changes due to load forecast uncertainty in the load bus and system risk indices and in the percentage change values are different for each generation expansion scenario. The topology and parameters of the system are different in each of the studied power system configurations. The effect of load forecast uncertainty on the system and load point adequacy can be quantified and utilized in the decision-making process associated with system generation and transmission planning. Load forecast uncertainty has important impacts on the system and load point indices that can only be appreciated by conducting comprehensive bulk system adequacy assessment. The actual effects are a complicated function of the system topology and parameters, and the system load curtailment philosophy. Karki, Rajesh Gokaraju, Ramakrishna Burton, Richard T. Billinton, Roy Takaya, Kunio University of Saskatchewan 2009-04-13 text application/pdf http://library.usask.ca/theses/available/etd-04012009-181008/ http://library.usask.ca/theses/available/etd-04012009-181008/ en unrestricted I hereby certify that, if appropriate, I have obtained and attached hereto a written permission statement from the owner(s) of each third party copyrighted matter to be included in my thesis, dissertation, or project report, allowing distribution as specified below. I certify that the version I submitted is the same as that approved by my advisory committee. I hereby grant to University of Saskatchewan or its agents the non-exclusive license to archive and make accessible, under the conditions specified below, my thesis, dissertation, or project report in whole or in part in all forms of media, now or hereafter known. I retain all other ownership rights to the copyright of the thesis, dissertation or project report. I also retain the right to use in future works (such as articles or books) all or part of this thesis, dissertation, or project report.
collection NDLTD
language en
format Others
sources NDLTD
topic load bus priority order
uncertainty of future system requirements
methods to forecast energy demand
system development and reinforcement planning
recognition of load uncertainty
spellingShingle load bus priority order
uncertainty of future system requirements
methods to forecast energy demand
system development and reinforcement planning
recognition of load uncertainty
Vega Hernandez, Nahun Bulmaro
Load forecast uncertainty considerations in bulk electrical system adequacy assessment
description The basic objective in bulk electrical system planning is to determine the necessary generating facilities required to ensure an adequate and economic supply of electrical energy and the development of an adequate transmission network to transport the generated energy to the customers. Quantitative adequacy assessment is a basic task in achieving this objective. An important requirement in this task is the ability to forecast the system load requirements at specific times in the future. These forecasts must also recognize the inherent uncertainty in predicting the future load demands.<p> The primary focus of the research described in this thesis is to examine the effects and implications of load forecast uncertainty on the load point and system adequacy indices of a composite generation and transmission system. This thesis considers two techniques to incorporate the inherent uncertainty associated with future load forecasts in the adequacy assessment of bulk electrical systems. Base case and factor analyses are performed on a number of power system configurations to identify and address the relative contributions to the load point and system indices due to load forecast uncertainty. A transmission reinforcement option and a number of generation system expansion options are presented to examine the system reliability response due to load forecast uncertainty.<p> The actual magnitudes of the changes due to load forecast uncertainty in the load bus and system risk indices and in the percentage change values are different for each generation expansion scenario. The topology and parameters of the system are different in each of the studied power system configurations. The effect of load forecast uncertainty on the system and load point adequacy can be quantified and utilized in the decision-making process associated with system generation and transmission planning. Load forecast uncertainty has important impacts on the system and load point indices that can only be appreciated by conducting comprehensive bulk system adequacy assessment. The actual effects are a complicated function of the system topology and parameters, and the system load curtailment philosophy.
author2 Karki, Rajesh
author_facet Karki, Rajesh
Vega Hernandez, Nahun Bulmaro
author Vega Hernandez, Nahun Bulmaro
author_sort Vega Hernandez, Nahun Bulmaro
title Load forecast uncertainty considerations in bulk electrical system adequacy assessment
title_short Load forecast uncertainty considerations in bulk electrical system adequacy assessment
title_full Load forecast uncertainty considerations in bulk electrical system adequacy assessment
title_fullStr Load forecast uncertainty considerations in bulk electrical system adequacy assessment
title_full_unstemmed Load forecast uncertainty considerations in bulk electrical system adequacy assessment
title_sort load forecast uncertainty considerations in bulk electrical system adequacy assessment
publisher University of Saskatchewan
publishDate 2009
url http://library.usask.ca/theses/available/etd-04012009-181008/
work_keys_str_mv AT vegahernandeznahunbulmaro loadforecastuncertaintyconsiderationsinbulkelectricalsystemadequacyassessment
_version_ 1716532378023755776