Improvement of Routine Test Process of High Voltage Power Capacitors

The capacitor test process at ABB Capacitors in Ludvika must be improved to meet future demands for high voltage products. To find a solution to how to improve the test process, an investigation was performed to establish which parts of the process are used and how they operate. Several parts which...

Full description

Bibliographic Details
Main Author: Vennerberg, Patrik
Format: Others
Language:English
Published: Högskolan Dalarna, Maskinteknik 2009
Subjects:
Online Access:http://urn.kb.se/resolve?urn=urn:nbn:se:du-4097
id ndltd-UPSALLA1-oai-dalea.du.se-4097
record_format oai_dc
spelling ndltd-UPSALLA1-oai-dalea.du.se-40972013-01-30T15:56:38ZImprovement of Routine Test Process of High Voltage Power CapacitorsengVennerberg, PatrikHögskolan Dalarna, MaskinteknikBorlänge2009Capacitortest cyclepugh matrixprocessdecision matriximprovementhigh voltageThe capacitor test process at ABB Capacitors in Ludvika must be improved to meet future demands for high voltage products. To find a solution to how to improve the test process, an investigation was performed to establish which parts of the process are used and how they operate. Several parts which can improves the process were identified. One of them was selected to be improved in correlation with the subject, mechanical engineering. Four concepts were generated and decision matrixes were used to systematically select the best concept. By improving the process several benefits has been added to the process. More units are able to be tested and lead time is reduced. As the lead time is reduced the cost for each unit is reduced, workers will work less hours for the same amount of tested units, future work to further improve the process is also identified. The selected concept was concept 1, the sway stop concept. This concept is used to reduce the sway of the capacitors as they have entered the test facility, the box. By improving this part of the test process a time saving of 20 seconds per unit can be achieved, equivalent to 7% time reduction. This can be compared to an additional 1400 units each year. Student thesisinfo:eu-repo/semantics/bachelorThesistexthttp://urn.kb.se/resolve?urn=urn:nbn:se:du-4097application/pdfinfo:eu-repo/semantics/openAccess
collection NDLTD
language English
format Others
sources NDLTD
topic Capacitor
test cycle
pugh matrix
process
decision matrix
improvement
high voltage
spellingShingle Capacitor
test cycle
pugh matrix
process
decision matrix
improvement
high voltage
Vennerberg, Patrik
Improvement of Routine Test Process of High Voltage Power Capacitors
description The capacitor test process at ABB Capacitors in Ludvika must be improved to meet future demands for high voltage products. To find a solution to how to improve the test process, an investigation was performed to establish which parts of the process are used and how they operate. Several parts which can improves the process were identified. One of them was selected to be improved in correlation with the subject, mechanical engineering. Four concepts were generated and decision matrixes were used to systematically select the best concept. By improving the process several benefits has been added to the process. More units are able to be tested and lead time is reduced. As the lead time is reduced the cost for each unit is reduced, workers will work less hours for the same amount of tested units, future work to further improve the process is also identified. The selected concept was concept 1, the sway stop concept. This concept is used to reduce the sway of the capacitors as they have entered the test facility, the box. By improving this part of the test process a time saving of 20 seconds per unit can be achieved, equivalent to 7% time reduction. This can be compared to an additional 1400 units each year.
author Vennerberg, Patrik
author_facet Vennerberg, Patrik
author_sort Vennerberg, Patrik
title Improvement of Routine Test Process of High Voltage Power Capacitors
title_short Improvement of Routine Test Process of High Voltage Power Capacitors
title_full Improvement of Routine Test Process of High Voltage Power Capacitors
title_fullStr Improvement of Routine Test Process of High Voltage Power Capacitors
title_full_unstemmed Improvement of Routine Test Process of High Voltage Power Capacitors
title_sort improvement of routine test process of high voltage power capacitors
publisher Högskolan Dalarna, Maskinteknik
publishDate 2009
url http://urn.kb.se/resolve?urn=urn:nbn:se:du-4097
work_keys_str_mv AT vennerbergpatrik improvementofroutinetestprocessofhighvoltagepowercapacitors
_version_ 1716576435893698560