Effektiv tillsyn av pågående verksamheter i Piteå kommun med MIFO fas 1 som verktyg : Underlag för strategival

The purpose of the study was to investigate how inventories of suspected polluted areas as a part of the planned control of existing companies cab be designed in order to achieve as great effect as possible. The study was conducted in cooperation with Piteå municipality. An analysis of regional inve...

Full description

Bibliographic Details
Main Author: Pettersson, Jakob
Format: Others
Language:Swedish
Published: Umeå universitet, Institutionen för ekologi, miljö och geovetenskap 2014
Subjects:
Online Access:http://urn.kb.se/resolve?urn=urn:nbn:se:umu:diva-94258
id ndltd-UPSALLA1-oai-DiVA.org-umu-94258
record_format oai_dc
spelling ndltd-UPSALLA1-oai-DiVA.org-umu-942582014-10-07T16:46:58ZEffektiv tillsyn av pågående verksamheter i Piteå kommun med MIFO fas 1 som verktyg : Underlag för strategivalswePettersson, JakobUmeå universitet, Institutionen för ekologi, miljö och geovetenskap2014Polluted areasMIFO fas 1municipal planninghealth and environment agencymethodologyThe purpose of the study was to investigate how inventories of suspected polluted areas as a part of the planned control of existing companies cab be designed in order to achieve as great effect as possible. The study was conducted in cooperation with Piteå municipality. An analysis of regional inventory projects, local municipal strategies and a pilot study in Piteå was conducted. The experience from both the regional projects and the pilot study was that in order to achieve an effective control a number of factors were inportant: an efficient selection of companies, a good dialogue between the controlling agency and the companies, sufficient resources, education of municipal inspectors and guidance for decisionmaking. Another inportant result was that the municipal planning can prevent an efficient inventory if the control of city development projects is allowed to take time from the planned control. The conclusion was that the unit for health an environmental care in Piteå municipality should try to achieve these factors in their work and start a cooperation with the municipal planners in order to create an efficient organization for treating polluted areas. Suggested future studies was to investigate how the planning process and the work of the municipal controlling agency can be synchronized in order to achieve a common goal. Student thesisinfo:eu-repo/semantics/bachelorThesistexthttp://urn.kb.se/resolve?urn=urn:nbn:se:umu:diva-94258application/pdfinfo:eu-repo/semantics/openAccess
collection NDLTD
language Swedish
format Others
sources NDLTD
topic Polluted areas
MIFO fas 1
municipal planning
health and environment agency
methodology
spellingShingle Polluted areas
MIFO fas 1
municipal planning
health and environment agency
methodology
Pettersson, Jakob
Effektiv tillsyn av pågående verksamheter i Piteå kommun med MIFO fas 1 som verktyg : Underlag för strategival
description The purpose of the study was to investigate how inventories of suspected polluted areas as a part of the planned control of existing companies cab be designed in order to achieve as great effect as possible. The study was conducted in cooperation with Piteå municipality. An analysis of regional inventory projects, local municipal strategies and a pilot study in Piteå was conducted. The experience from both the regional projects and the pilot study was that in order to achieve an effective control a number of factors were inportant: an efficient selection of companies, a good dialogue between the controlling agency and the companies, sufficient resources, education of municipal inspectors and guidance for decisionmaking. Another inportant result was that the municipal planning can prevent an efficient inventory if the control of city development projects is allowed to take time from the planned control. The conclusion was that the unit for health an environmental care in Piteå municipality should try to achieve these factors in their work and start a cooperation with the municipal planners in order to create an efficient organization for treating polluted areas. Suggested future studies was to investigate how the planning process and the work of the municipal controlling agency can be synchronized in order to achieve a common goal.
author Pettersson, Jakob
author_facet Pettersson, Jakob
author_sort Pettersson, Jakob
title Effektiv tillsyn av pågående verksamheter i Piteå kommun med MIFO fas 1 som verktyg : Underlag för strategival
title_short Effektiv tillsyn av pågående verksamheter i Piteå kommun med MIFO fas 1 som verktyg : Underlag för strategival
title_full Effektiv tillsyn av pågående verksamheter i Piteå kommun med MIFO fas 1 som verktyg : Underlag för strategival
title_fullStr Effektiv tillsyn av pågående verksamheter i Piteå kommun med MIFO fas 1 som verktyg : Underlag för strategival
title_full_unstemmed Effektiv tillsyn av pågående verksamheter i Piteå kommun med MIFO fas 1 som verktyg : Underlag för strategival
title_sort effektiv tillsyn av pågående verksamheter i piteå kommun med mifo fas 1 som verktyg : underlag för strategival
publisher Umeå universitet, Institutionen för ekologi, miljö och geovetenskap
publishDate 2014
url http://urn.kb.se/resolve?urn=urn:nbn:se:umu:diva-94258
work_keys_str_mv AT petterssonjakob effektivtillsynavpagaendeverksamheteripiteakommunmedmifofas1somverktygunderlagforstrategival
_version_ 1716716031878103040