PROJEKTERINGSÖVERSYN PÅ NCC I UMEÅ

During the design phase of a building and construction project, blueprints are reviewed. This can be done in slightly different ways, which can also give different consequences for the involved tasks or increased costs for the company if faults were not noticed in time before the next stage of the c...

Full description

Bibliographic Details
Main Author: Simon, Olofsson
Format: Others
Language:Swedish
Published: Umeå universitet, Institutionen för tillämpad fysik och elektronik 2020
Subjects:
Online Access:http://urn.kb.se/resolve?urn=urn:nbn:se:umu:diva-172654
Description
Summary:During the design phase of a building and construction project, blueprints are reviewed. This can be done in slightly different ways, which can also give different consequences for the involved tasks or increased costs for the company if faults were not noticed in time before the next stage of the construction process. At the start of the study, NCC Infrastructure Department Civil SE North experienced problems with review routines of drawing material, which hired consultants developed. Therefore, this exam work was established to generalize the reviewing process, save time but also ensure the accuracy of the work. The purpose of the study was to study parts of the planning process at NCC and to note deficiencies regarding their design review, but also to create an overview of how the blueprint review is done in a company like NCC and what problems that can arise during the reviewing process. To achieve the goal, the establishment of a supplementary basis in the form of a checklist to follow when reviewing blueprints, several methods were used. Literature study for theory of the area, document study for understanding the problems in the blueprints, which also formed the basis for the interview study's questions that resulted in what is to be examined, which areas that are critical and the staff's perception of today's reviewing process. Like many professions and projects, time is a critical aspect. At NCC it was felt that there was too little time allocated for the review, but also for the projection itself for some projects. More than half of the interviewees also felt that the number of resources allocated for review was too few. The most critical areas for blueprints were considered to be ground as well as water and sewer blueprints. Within these, the height and dimensions plan for ground blueprints were considered to be the most inadequate and ground plans for water and sewage as well. Another problem that everyone interviewed at NCC Infrastructure mentioned was that they experienced a lack of communication between hired consultants. This as each parts blueprint collided with another one’s solutions or not agreed on object locations. It is important that NCC improves clarity and guiding against hired consultants so that the quantities of materials and the choice of materials do not exceed the calculated price for the offered project. The same applies to the review process, it should be generalized and there the checklist comes in handy and can clog up uncertainties and errors that otherwise might occur or be missed, as well as simplify the work for those who are to conduct the review. In addition, the Bluebeam program should always have a significant degree of utilization when reviewing, and traditional review (by pen and paper) should only be used when collaborating with colleagues and then entering Bluebeam. === Under projekteringsfasen av ett bygg- och anläggningsprojekt så granskas upprättade ritningar. Granskningen kan göras på olika sätt och i olika omfattning vilket kan vara direkt avgörande för framgången i ett projekt. Uppmärksammas inte brister i underlag i tid så kan detta medföra stora kostnadspåslag, tidsbrist, produktionsstopp samt mer arbete för produktionspersonalen med flera. NCC Infrastructure avdelning Civil SE North upplevde vid studiens start ett antal problem med deras granskningsrutiner av ritningsmaterial, som anlitade projektörer tagit fram. Därav upprättades detta examensarbete för att generalisera granskningsprocessen, spara tid samt säkerställa noggrannheten för arbetet.  Syftet med studien var att studera en del av projekteringen på NCC och uppmärksamma brister gällande deras projekteringsgranskning, samt även få en överblick angående hur en sådan process fungerar i praktiken. Med tillhörande problem som kan uppstå under projekteringsskedet för ett projekt. För att nå målet, upprättande av ett kompletterande underlag i form av en anvisning/checklista att följa vid projekteringsgranskning, så nyttjades flera metoder. Litteraturstudie till information om området, dokumentstudie för förståelse av problemen i ritningarna, vilket även stod till grund för intervjustudiens frågeställningar som mynnade ut i ett resultat angivande vad som skall granskas, vilka områden som är kritiska samt personalens uppfattning av dagens projekteringsgranskning. Liksom i många branscher så är tiden en kritisk aspekt. På NCC upplevdes det att det avsattes för lite tid åt själva granskningen, men även för projekteringen i sig för vissa projekt. Fler än hälften av de intervjuade ansåg även att antal tillsatta resurser för granskning var för få. De mest kritiska områdena för ritningar ansågs vara markritningar samt VA-ritningar (vatten- och avloppsritningar). För markritningar ansågs höjd- och måttplan vara den mest bristfälliga och för VA-ritningar var det planerna. Ännu ett problem som alla intervjuade på Infrastructure nämnde var att de upplevde kommunikationsbrist mellan anlitade projektörer. Detta då respektive parts ritningar kolliderat med någon annan eller ej stämt överens angående objektplaceringar.  Styrningen och tydligheten mot projektörerna är det viktigt att NCC förbättrar så att inte innehållet i projekterade ritningars mängd och material sväller mot anbudet kostnadsmässigt. Detsamma gäller granskningsprocessen, den bör generaliseras så att checklistan kommer till nytta och kan täppa igen osäkerheter och fel som annars kan uppstå eller missas, samt även förenkla arbetet för dem som skall genomföra granskningen. Programmet Bluebeam som är ett av VDC verktygen som NCC-koncernen har att tillgå bör dessutom alltid ha en väsentlig nyttjandegrad vid granskning. Medan traditionell granskning endast bör användas vid samgranskning mellan kollegor för att sedan föra in synpunkter i Bluebeam.