Optimization of the Cab Production Sequence : A simulation-based study at Volvo Group Trucks' cab plant in Umeå
Volvo Group’s cab plant in Umeå produces cab bodies and consists of three operating areas; the Stamping and parts production, the Body in White and the Paint shop. Today the plant produces around XXX cabs/week, but the goal is to reach the invested capacity of XXX cabs/week. In order to increase the...
Main Authors: | Jonsson, Hanna, Sjöström, Emmy |
---|---|
Format: | Others |
Language: | English |
Published: |
Umeå universitet, Institutionen för matematik och matematisk statistik
2016
|
Subjects: | |
Online Access: | http://urn.kb.se/resolve?urn=urn:nbn:se:umu:diva-123343 |
Similar Items
-
Flow simulation of Body In White : Optimization of the production sequence and identification of bottlenecks at Volvo Trucks plant in Umeå
by: Lundberg, Mattias, et al.
Published: (2017) -
Visualization and simulation of idle truck energy usage : Prediction of battery discharge in a Volvo truck cab
by: Elvmarker, Simon
Published: (2018) -
Stress of dynamic loaded protection cab ROPS of truck
by: Ševčík Ladislav, et al.
Published: (2017-01-01) -
Filter cleaning device : for truck cab climate systems
by: Andersson, Filip, et al.
Published: (2018) -
Advantage in Cab
by: Rossi Urquijo, Javier, et al.
Published: (2018)