Balancing of Offshore Wind Power in Mid-Norway : Implementation of a load frequency control scheme for handling secondary control challenges caused by wind power

In order to comply with governmentally announced greenhouse gas emission reductions goals and to consolidate an independent and stable electric power and energy supply, Norway must increase its installed renewable energy based power generation capacity. Profitability estimations, today’s available t...

Full description

Bibliographic Details
Main Author: Gleditsch, Morten
Format: Others
Language:English
Published: Norges teknisk-naturvitenskapelige universitet, Institutt for elkraftteknikk 2009
Subjects:
Online Access:http://urn.kb.se/resolve?urn=urn:nbn:no:ntnu:diva-9104
id ndltd-UPSALLA1-oai-DiVA.org-ntnu-9104
record_format oai_dc
spelling ndltd-UPSALLA1-oai-DiVA.org-ntnu-91042013-01-08T13:26:29ZBalancing of Offshore Wind Power in Mid-Norway : Implementation of a load frequency control scheme for handling secondary control challenges caused by wind powerengGleditsch, MortenNorges teknisk-naturvitenskapelige universitet, Institutt for elkraftteknikkInstitutt for elkraftteknikk2009ntnudaimMSELPOWER Master of Science in Electric Power EngineeringElektrisk EnergiteknikkIn order to comply with governmentally announced greenhouse gas emission reductions goals and to consolidate an independent and stable electric power and energy supply, Norway must increase its installed renewable energy based power generation capacity. Profitability estimations, today’s available technical solutions and regulations concerning preservation of natural resources leave construction of new small hydro power plants behind as the most plausible alternative together with construction of wind farms. Global trends such as technologic development and progress and the public opinion indicate that future wind farms in Norway will be located offshore. The assumption is supported by the recent handing out of a concession to an offshore wind farm project for the first time in Norwegian history. The projects name is Havsul 1 and the licence involves construction of 350 MW offshore wind power. Havsul 1 will be located in Mid-Norway, which is the region in Norway where the Norwegian Transmission System Operator (TSO) Statnett is most concerned about their ability to execute their task of assuring safety of power supply in the future. The concern owes to lack of generation capacity and transmission constraints. Experience show that commissioning of large offshore wind farms will impose power balance associated challenges on the TSO. By applying a slightly modified model developed by Sintef of the Nordel synchronous system in the power simulation tool DIgSILENT PowerFactory, grid connection of 350 MW and 1000 MW offshore wind farms to a bus bar representing Mid-Norway were investigated, targeting reduction of frequency excursions. To execute the reduction task, a so-called centralised Load Frequency Control (LFC) scheme was implemented and four hydro power plants were designated to provide regulating power pursuant to a priority key that used their response times as input. To simulate power fluctuations in the time span of hours, real time wind data acquired from the Danish offshore wind farm Horns Rev 1 was used as input in the offshore wind farm model. These data were kindly provided by the Swedish power company Vattenfall. The power fluctuations simulations showed that LFC is a well-fitted tool for bridling frequency excursions in the Nordel synchronous system caused by fluctuating power generation in an offshore wind farm. During the power fluctuations, which were of a particularly challenging kind, the system frequency complied with Statnett’s normal operation requirements of 50 ±0.1 Hz. The results weren’t too surprising since LFC has been used successfully in Europe for many years. They did however show that the amounts of the so-called frequency controlled normal operation reserves in Nordel may need to be expanded in case of a massive expansion in wind power in Norway. Fault Ride Through (FRT) investigations were also conducted by introducing 3-phase short circuit faults at selected bus bars. The simulations showed that the FRT requirements in Norway were not violated even in the worst case simulations. Some choices regarding the setup of the model may have exalted the simulation results. Student thesisinfo:eu-repo/semantics/bachelorThesistexthttp://urn.kb.se/resolve?urn=urn:nbn:no:ntnu:diva-9104Local ntnudaim:4875application/pdfinfo:eu-repo/semantics/openAccess
collection NDLTD
language English
format Others
sources NDLTD
topic ntnudaim
MSELPOWER Master of Science in Electric Power Engineering
Elektrisk Energiteknikk
spellingShingle ntnudaim
MSELPOWER Master of Science in Electric Power Engineering
Elektrisk Energiteknikk
Gleditsch, Morten
Balancing of Offshore Wind Power in Mid-Norway : Implementation of a load frequency control scheme for handling secondary control challenges caused by wind power
description In order to comply with governmentally announced greenhouse gas emission reductions goals and to consolidate an independent and stable electric power and energy supply, Norway must increase its installed renewable energy based power generation capacity. Profitability estimations, today’s available technical solutions and regulations concerning preservation of natural resources leave construction of new small hydro power plants behind as the most plausible alternative together with construction of wind farms. Global trends such as technologic development and progress and the public opinion indicate that future wind farms in Norway will be located offshore. The assumption is supported by the recent handing out of a concession to an offshore wind farm project for the first time in Norwegian history. The projects name is Havsul 1 and the licence involves construction of 350 MW offshore wind power. Havsul 1 will be located in Mid-Norway, which is the region in Norway where the Norwegian Transmission System Operator (TSO) Statnett is most concerned about their ability to execute their task of assuring safety of power supply in the future. The concern owes to lack of generation capacity and transmission constraints. Experience show that commissioning of large offshore wind farms will impose power balance associated challenges on the TSO. By applying a slightly modified model developed by Sintef of the Nordel synchronous system in the power simulation tool DIgSILENT PowerFactory, grid connection of 350 MW and 1000 MW offshore wind farms to a bus bar representing Mid-Norway were investigated, targeting reduction of frequency excursions. To execute the reduction task, a so-called centralised Load Frequency Control (LFC) scheme was implemented and four hydro power plants were designated to provide regulating power pursuant to a priority key that used their response times as input. To simulate power fluctuations in the time span of hours, real time wind data acquired from the Danish offshore wind farm Horns Rev 1 was used as input in the offshore wind farm model. These data were kindly provided by the Swedish power company Vattenfall. The power fluctuations simulations showed that LFC is a well-fitted tool for bridling frequency excursions in the Nordel synchronous system caused by fluctuating power generation in an offshore wind farm. During the power fluctuations, which were of a particularly challenging kind, the system frequency complied with Statnett’s normal operation requirements of 50 ±0.1 Hz. The results weren’t too surprising since LFC has been used successfully in Europe for many years. They did however show that the amounts of the so-called frequency controlled normal operation reserves in Nordel may need to be expanded in case of a massive expansion in wind power in Norway. Fault Ride Through (FRT) investigations were also conducted by introducing 3-phase short circuit faults at selected bus bars. The simulations showed that the FRT requirements in Norway were not violated even in the worst case simulations. Some choices regarding the setup of the model may have exalted the simulation results.
author Gleditsch, Morten
author_facet Gleditsch, Morten
author_sort Gleditsch, Morten
title Balancing of Offshore Wind Power in Mid-Norway : Implementation of a load frequency control scheme for handling secondary control challenges caused by wind power
title_short Balancing of Offshore Wind Power in Mid-Norway : Implementation of a load frequency control scheme for handling secondary control challenges caused by wind power
title_full Balancing of Offshore Wind Power in Mid-Norway : Implementation of a load frequency control scheme for handling secondary control challenges caused by wind power
title_fullStr Balancing of Offshore Wind Power in Mid-Norway : Implementation of a load frequency control scheme for handling secondary control challenges caused by wind power
title_full_unstemmed Balancing of Offshore Wind Power in Mid-Norway : Implementation of a load frequency control scheme for handling secondary control challenges caused by wind power
title_sort balancing of offshore wind power in mid-norway : implementation of a load frequency control scheme for handling secondary control challenges caused by wind power
publisher Norges teknisk-naturvitenskapelige universitet, Institutt for elkraftteknikk
publishDate 2009
url http://urn.kb.se/resolve?urn=urn:nbn:no:ntnu:diva-9104
work_keys_str_mv AT gleditschmorten balancingofoffshorewindpowerinmidnorwayimplementationofaloadfrequencycontrolschemeforhandlingsecondarycontrolchallengescausedbywindpower
_version_ 1716520466739363840