Analysis of Potential Problems Related to Water Inflow for TBM tunneling at Røssåga Hydropower Project
The new headrace tunnel at the water power station at Røssåga will be constructed with TBM and the project will thereby have Norway´s first TBM-tunnel since 1993. The tunnel is located in Nordland with a lot of calcareous rock types and the risk of encountering karst and w...
Main Author: | Finnøy, Agnethe Hoff |
---|---|
Format: | Others |
Language: | English |
Published: |
Norges teknisk-naturvitenskapelige universitet, Institutt for geologi og bergteknikk
2014
|
Online Access: | http://urn.kb.se/resolve?urn=urn:nbn:no:ntnu:diva-25964 |
Similar Items
-
Microseismic Monitoring of Energy Changes in Deep Tunnels during the TBM Tunneling of the Jinping II Hydropower Station
by: Duanyang Zhuang, et al.
Published: (2018-01-01) -
TBM Tunnelling at the Stillwater Mine
by: Eide, Leon Nikolay Røren
Published: (2014) -
Interaction between groundwater and TBM (Tunnel Boring Machine) excavated tunnels
by: Font Capó, Jordi
Published: (2012) -
Estimation of soft ground tool life in TBM tunnelling
by: Jakobsen, Pål Drevland
Published: (2014) -
Anti Abrasive Additives for Hard Rock TBM Tunnelling
by: Valestrand, Anders J, et al.
Published: (2013)