Installation of large subsea structures : Lowering of suction anchors through the splash zone
In this thesis the dynamic air cushion pressure inside suction anchors during low-ering through the splash zone has been studied. A non-linear continuity equationfor the air mass is used to establish a theoretical model for the dynamic air cush-ion pressure. Buoyancy forces due to dynamic air cushio...
Main Author: | Bertelsen, Torleif Olund |
---|---|
Format: | Others |
Language: | English |
Published: |
Norges teknisk-naturvitenskapelige universitet, Institutt for marin teknikk
2014
|
Online Access: | http://urn.kb.se/resolve?urn=urn:nbn:no:ntnu:diva-25930 |
Similar Items
-
Study of the Installation Process of the Subsea Tree Passed Through the Splash Zone
by: Yufang Li, et al.
Published: (2020-02-01) -
Lowering operation of a subsea module using air filled suction anchors to reduce the crane load capacity required.
by: Kvadsheim, Henrik
Published: (2010) -
Assessment of Feasibility of Suction Pile/Anchor Installation and Pullout Testing through Field Tests
by: R. Vijaya, et al.
Published: (2014-09-01) -
Corrosion of steel in the marine splash-zone
by: Shaw, D.
Published: (1979) -
LIMIT STATE CRITERION THEORY FOR PIPELINE SUBSEA INSTALLATION PROCESSES
by: Wedin, Hampus
Published: (2012)