Risk in crane and lifting operations related to the logistic interaction process for well and drilling
This master thesis compares the logistic chain of operations and maintenance versus drilling and well and finds how drilling and well affect this chain with regards to risk on crane and lifting operations. Research has been done through accident/incident analysis, statistic, observations and intervi...
Main Author: | Prøsch, Kristine |
---|---|
Format: | Others |
Language: | English |
Published: |
Norges teknisk-naturvitenskapelige universitet, Institutt for marin teknikk
2011
|
Online Access: | http://urn.kb.se/resolve?urn=urn:nbn:no:ntnu:diva-15570 |
Similar Items
-
Crane lifting operation planning and lifted object spatial trajectory analysis
by: Olearczyk, Jacek
Published: (2010) -
NECESSITY OF WIRE ROPE REPLACEMENT IN CRANE LIFTING EQUIPMENT AFTER CHANGE OF CRANE OPERATIONAL PARAMETERS
by: Jozef Kuľka, et al.
Published: (2017-06-01) -
Risk assessment during operating self-propelled lifting jib cranes in conditions of insufficient information
by: Lagerev A.V., et al.
Published: (2017-06-01) -
The likelihood of failures in the operation of the lifting mechanism electrical hook bridge crane
by: Ritenman I.L., et al.
Published: (2017-09-01) -
RELIABILITY ANALYSIS OF CRANE LIFTING MECHANISM
by: Eva FALTINOVÁ, et al.
Published: (2018-03-01)