Guidelines for selection of a ship ballast water treatment system.

The purpose of the thesis was to develop a decision support system for ballast water treatment systems, considering both technical and economical aspects of the system. This was done by developing a two part model, which considers both physical constraint given by the ship, and KPI analysis. In orde...

Full description

Bibliographic Details
Main Author: Berntzen, Magnus
Format: Others
Language:English
Published: Norges teknisk-naturvitenskapelige universitet, Institutt for marin teknikk 2010
Online Access:http://urn.kb.se/resolve?urn=urn:nbn:no:ntnu:diva-11440
id ndltd-UPSALLA1-oai-DiVA.org-ntnu-11440
record_format oai_dc
spelling ndltd-UPSALLA1-oai-DiVA.org-ntnu-114402013-01-08T13:27:52Z Guidelines for selection of a ship ballast water treatment system.engBerntzen, MagnusNorges teknisk-naturvitenskapelige universitet, Institutt for marin teknikk2010The purpose of the thesis was to develop a decision support system for ballast water treatment systems, considering both technical and economical aspects of the system. This was done by developing a two part model, which considers both physical constraint given by the ship, and KPI analysis. In order to test the model, it was applied on two vessels from KGJS fleet; MV Corrella Arrow, a 72.000 DWT general cargo ship, and a cement carrier that is currently being built in Vietnam. For both these ships the model identified 6 – 8 systems that were applicable, but by applying ship specific constraints and additional knowledge of the systems it was possible to eliminate several other systems. As a means to further eliminate systems, a detailed analysis was required. When analysing the operational costs, it was found that installing a treatment system will increase the daily operational costs with $1 - $30, and increase the annual fuel consumption with 1 – 20 tons. This is negligible when compared to the installation and investment cost. For the cement carrier it was that two systems were applicable to the ship; OptiMarin Ballast System and Hyde Guardian. Where Hyde Guardian be too large, OptiMarin Ballast system will have a higher cost. Simplicity have to be considered against cost. For MV Corrella Arrow, WSE Unitor was found to be the best option. However, it should be noted that as the reactor unit is located before the ballast pumps, the negative effects it might have on the ballast pumps should be closely monitored after installation. Student thesisinfo:eu-repo/semantics/bachelorThesistexthttp://urn.kb.se/resolve?urn=urn:nbn:no:ntnu:diva-11440application/pdfinfo:eu-repo/semantics/openAccess
collection NDLTD
language English
format Others
sources NDLTD
description The purpose of the thesis was to develop a decision support system for ballast water treatment systems, considering both technical and economical aspects of the system. This was done by developing a two part model, which considers both physical constraint given by the ship, and KPI analysis. In order to test the model, it was applied on two vessels from KGJS fleet; MV Corrella Arrow, a 72.000 DWT general cargo ship, and a cement carrier that is currently being built in Vietnam. For both these ships the model identified 6 – 8 systems that were applicable, but by applying ship specific constraints and additional knowledge of the systems it was possible to eliminate several other systems. As a means to further eliminate systems, a detailed analysis was required. When analysing the operational costs, it was found that installing a treatment system will increase the daily operational costs with $1 - $30, and increase the annual fuel consumption with 1 – 20 tons. This is negligible when compared to the installation and investment cost. For the cement carrier it was that two systems were applicable to the ship; OptiMarin Ballast System and Hyde Guardian. Where Hyde Guardian be too large, OptiMarin Ballast system will have a higher cost. Simplicity have to be considered against cost. For MV Corrella Arrow, WSE Unitor was found to be the best option. However, it should be noted that as the reactor unit is located before the ballast pumps, the negative effects it might have on the ballast pumps should be closely monitored after installation.
author Berntzen, Magnus
spellingShingle Berntzen, Magnus
 Guidelines for selection of a ship ballast water treatment system.
author_facet Berntzen, Magnus
author_sort Berntzen, Magnus
title  Guidelines for selection of a ship ballast water treatment system.
title_short  Guidelines for selection of a ship ballast water treatment system.
title_full  Guidelines for selection of a ship ballast water treatment system.
title_fullStr  Guidelines for selection of a ship ballast water treatment system.
title_full_unstemmed  Guidelines for selection of a ship ballast water treatment system.
title_sort  guidelines for selection of a ship ballast water treatment system.
publisher Norges teknisk-naturvitenskapelige universitet, Institutt for marin teknikk
publishDate 2010
url http://urn.kb.se/resolve?urn=urn:nbn:no:ntnu:diva-11440
work_keys_str_mv AT berntzenmagnus guidelinesforselectionofashipballastwatertreatmentsystem
_version_ 1716520969384755200