Kostnadskalkyler med osäkerhetsanalys och subjektiva sannolikheter : En fallstudie på Biogas Mellannorrland
The purpose with this study is to show how the subjective uncertainty analysis can be applied to the cost estimates and examine how the attitudes towards risk budgeting of construction projects works. Biogas Mellannorrland is based on a case study and focuses on four location options for the biogas...
Main Authors: | , |
---|---|
Format: | Others |
Language: | Swedish |
Published: |
Mittuniversitetet, Avdelningen för informationssystem och -teknologi
2017
|
Subjects: | |
Online Access: | http://urn.kb.se/resolve?urn=urn:nbn:se:miun:diva-30591 |
id |
ndltd-UPSALLA1-oai-DiVA.org-miun-30591 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-UPSALLA1-oai-DiVA.org-miun-305912019-08-23T04:38:05ZKostnadskalkyler med osäkerhetsanalys och subjektiva sannolikheter : En fallstudie på Biogas MellannorrlandsweKwiatkowski, RobertHtay, ShweMittuniversitetet, Avdelningen för informationssystem och -teknologiMittuniversitetet, Avdelningen för informationssystem och -teknologi2017Biogas Mellannorrlandnormal distributionuncertainty analysisPearson Tukeystandard deviationsubjective probabilityexpected valueBiogas MellannorrlandnormalfördelningosäkerhetsanalysPearson-Tukeystandardavvikelsesubjektiva sannolikheterväntevärdeOther Engineering and Technologies not elsewhere specifiedÖvrig annan teknikThe purpose with this study is to show how the subjective uncertainty analysis can be applied to the cost estimates and examine how the attitudes towards risk budgeting of construction projects works. Biogas Mellannorrland is based on a case study and focuses on four location options for the biogas plant. For each option, a cost estimate in form of a fixed cost and variable cost elements, where the latter are uncertain. Pearson-Tukey method have been applied as a method to estimating subjective probabilities. An assumption is made so that the uncertain costs are normally distributed, where the parameters’ mean and standard deviation collected from respondents indicating percentiles at 5% and 95% for doubtful cost elements. In order to identify the project managers risk attitude, the risk premium method will be used to calculate where the expected value is produced by Pearson-Tukey method. The expected value is subtracted with certainty equivalent, which consist of the budgeted amount. The study was conducted through interviews in order to obtain the costs and the subjective probabilities. The study results show that it is difficult to determine which option is the best, or the worst, by just looking at the expected value. The risk premium shows that each option is a risk averse choice for the project managers, since the risk premium was greater than zero. Denna studie syftar till att visa hur subjektiv osäkerhetsanalys kan tillämpas vid kostnadskalkyler samt undersöka riskattityder vid budgetering av byggprojekt. Undersökningen är en fallstudie vid Biogas Mellannorrland och fokuserar på fyra lokaliseringsalternativ för biogasanläggning. För varje alternativ görs en kostnadskalkyl i form av ett antal fasta och rörliga delkostnader, där de senare är osäkra. Som metod för att skatta subjektiva sannolikheter har Pearson-Tukey-metoden tillämpats. Ett antagande görs att osäkra kostnader är normalfördelade, där parametrarna väntevärde och standardavvikelse hämtas från respondenter som anger percentilerna vid 5 % och 95 % för osäkra delkostnader. För att identifiera projektledarnas riskattityd, kommer riskpremium att beräknas, där det förväntade värdet tas fram med Pearson-Tukey- metoden. Det förväntade värdet subtraheras med säkerhetsekvivalensen, vilket utgörs av det budgeterade beloppet. Studien har genomförts med hjälp av intervjuer för att få fram kostnader och subjektiva sannolikheter. Studiens resultat visar att det är svårt att avgöra vilka alternativ som är bäst eller sämst genom att bara titta på väntevärdet. Med riskpremium visar alla alternativ att projektledarna gör ett riskaversivt val, eftersom riskpremium blev större än noll. Student thesisinfo:eu-repo/semantics/bachelorThesistexthttp://urn.kb.se/resolve?urn=urn:nbn:se:miun:diva-30591Local IG-V16-G3-017application/pdfinfo:eu-repo/semantics/openAccess |
collection |
NDLTD |
language |
Swedish |
format |
Others
|
sources |
NDLTD |
topic |
Biogas Mellannorrland normal distribution uncertainty analysis Pearson Tukey standard deviation subjective probability expected value Biogas Mellannorrland normalfördelning osäkerhetsanalys Pearson-Tukey standardavvikelse subjektiva sannolikheter väntevärde Other Engineering and Technologies not elsewhere specified Övrig annan teknik |
spellingShingle |
Biogas Mellannorrland normal distribution uncertainty analysis Pearson Tukey standard deviation subjective probability expected value Biogas Mellannorrland normalfördelning osäkerhetsanalys Pearson-Tukey standardavvikelse subjektiva sannolikheter väntevärde Other Engineering and Technologies not elsewhere specified Övrig annan teknik Kwiatkowski, Robert Htay, Shwe Kostnadskalkyler med osäkerhetsanalys och subjektiva sannolikheter : En fallstudie på Biogas Mellannorrland |
description |
The purpose with this study is to show how the subjective uncertainty analysis can be applied to the cost estimates and examine how the attitudes towards risk budgeting of construction projects works. Biogas Mellannorrland is based on a case study and focuses on four location options for the biogas plant. For each option, a cost estimate in form of a fixed cost and variable cost elements, where the latter are uncertain. Pearson-Tukey method have been applied as a method to estimating subjective probabilities. An assumption is made so that the uncertain costs are normally distributed, where the parameters’ mean and standard deviation collected from respondents indicating percentiles at 5% and 95% for doubtful cost elements. In order to identify the project managers risk attitude, the risk premium method will be used to calculate where the expected value is produced by Pearson-Tukey method. The expected value is subtracted with certainty equivalent, which consist of the budgeted amount. The study was conducted through interviews in order to obtain the costs and the subjective probabilities. The study results show that it is difficult to determine which option is the best, or the worst, by just looking at the expected value. The risk premium shows that each option is a risk averse choice for the project managers, since the risk premium was greater than zero. === Denna studie syftar till att visa hur subjektiv osäkerhetsanalys kan tillämpas vid kostnadskalkyler samt undersöka riskattityder vid budgetering av byggprojekt. Undersökningen är en fallstudie vid Biogas Mellannorrland och fokuserar på fyra lokaliseringsalternativ för biogasanläggning. För varje alternativ görs en kostnadskalkyl i form av ett antal fasta och rörliga delkostnader, där de senare är osäkra. Som metod för att skatta subjektiva sannolikheter har Pearson-Tukey-metoden tillämpats. Ett antagande görs att osäkra kostnader är normalfördelade, där parametrarna väntevärde och standardavvikelse hämtas från respondenter som anger percentilerna vid 5 % och 95 % för osäkra delkostnader. För att identifiera projektledarnas riskattityd, kommer riskpremium att beräknas, där det förväntade värdet tas fram med Pearson-Tukey- metoden. Det förväntade värdet subtraheras med säkerhetsekvivalensen, vilket utgörs av det budgeterade beloppet. Studien har genomförts med hjälp av intervjuer för att få fram kostnader och subjektiva sannolikheter. Studiens resultat visar att det är svårt att avgöra vilka alternativ som är bäst eller sämst genom att bara titta på väntevärdet. Med riskpremium visar alla alternativ att projektledarna gör ett riskaversivt val, eftersom riskpremium blev större än noll. |
author |
Kwiatkowski, Robert Htay, Shwe |
author_facet |
Kwiatkowski, Robert Htay, Shwe |
author_sort |
Kwiatkowski, Robert |
title |
Kostnadskalkyler med osäkerhetsanalys och subjektiva sannolikheter : En fallstudie på Biogas Mellannorrland |
title_short |
Kostnadskalkyler med osäkerhetsanalys och subjektiva sannolikheter : En fallstudie på Biogas Mellannorrland |
title_full |
Kostnadskalkyler med osäkerhetsanalys och subjektiva sannolikheter : En fallstudie på Biogas Mellannorrland |
title_fullStr |
Kostnadskalkyler med osäkerhetsanalys och subjektiva sannolikheter : En fallstudie på Biogas Mellannorrland |
title_full_unstemmed |
Kostnadskalkyler med osäkerhetsanalys och subjektiva sannolikheter : En fallstudie på Biogas Mellannorrland |
title_sort |
kostnadskalkyler med osäkerhetsanalys och subjektiva sannolikheter : en fallstudie på biogas mellannorrland |
publisher |
Mittuniversitetet, Avdelningen för informationssystem och -teknologi |
publishDate |
2017 |
url |
http://urn.kb.se/resolve?urn=urn:nbn:se:miun:diva-30591 |
work_keys_str_mv |
AT kwiatkowskirobert kostnadskalkylermedosakerhetsanalysochsubjektivasannolikheterenfallstudiepabiogasmellannorrland AT htayshwe kostnadskalkylermedosakerhetsanalysochsubjektivasannolikheterenfallstudiepabiogasmellannorrland |
_version_ |
1719236664320065536 |