Press-sekvens för lagerringar

This report is the result of a thesis work in mechanichal engineering performed at Volvo GroupTrucks Operations, Powertrain productions in Köping by the student Christoffer Jansson. Thework of 15 ECTS credits is conducted over a 20 week period at half speed equivalent to 400working hours.The backgro...

Full description

Bibliographic Details
Main Author: Jansson, Christoffer
Format: Others
Language:Swedish
Published: Mälardalens högskola, Innovation och produktrealisering 2016
Subjects:
Online Access:http://urn.kb.se/resolve?urn=urn:nbn:se:mdh:diva-32465
id ndltd-UPSALLA1-oai-DiVA.org-mdh-32465
record_format oai_dc
spelling ndltd-UPSALLA1-oai-DiVA.org-mdh-324652016-08-30T05:10:05ZPress-sekvens för lagerringarsweJansson, ChristofferMälardalens högskola, Innovation och produktrealisering2016LagerringarPressverktygPress-sekvensMonteringsbanaMonteringslinaLagerpressThis report is the result of a thesis work in mechanichal engineering performed at Volvo GroupTrucks Operations, Powertrain productions in Köping by the student Christoffer Jansson. Thework of 15 ECTS credits is conducted over a 20 week period at half speed equivalent to 400working hours.The background to the work is the desire to improve a workstation where the transmissions tothe IPS2/3 and IPS15 are assembled. The problem on the workstation is that the workers areperforming non value-added activities (NVAA) and it is of interest that one would examine thepossibility of how to squeeze two bearing rings in the same sequence. The aim is thus todevelop a suggestion of improvement for the bearing pressing method on the assembly line.The issue the thesis work is based on is: How does one manage to press together two bearingrings in the same sequence into a particular component? & How can one improve theergonomic circumstances on the workstation?To be able to perform this work, a case study based on the product development processaccording to Ulrich and Eppinger (2012) has been made. Product development tools are used tofacilitate the work of the student. Including Gantt chart, Pugh's analysis and functional analysis.The result of the work is a modification of the existing working table where the bearing ringsare pressed into the middle gear housing. The solution consists of a steel plate that rests on fivesprings which dampen the weight of the middle gear housing. The middle gear housing is thecomponent in which the bearing rings are pressed in. There are 5 guiding rods that are mountedon the steel plate, one for each spring, which has the function to keep the steel plate stablewhen the middle gear housing is set on top. These guiding rods are in turn controlled bybushings which serve to reduce friction. The bushings are standard components that aremounted into a component called the bushing holder, which is a component that is screwed intothe table.The new working process the solution provides eliminates the previous NVAA that has been onthe station before and allows the worker to press two bearing rings into the middle gearinghouse in the same sequence. The ergonomic circumstances have also been improved due to theelimination of the worker having to rotate the heavy middle gearing house 180 degrees. Thesolution thus meets the demands made in the report and solves the problems identified. Student thesisinfo:eu-repo/semantics/bachelorThesistexthttp://urn.kb.se/resolve?urn=urn:nbn:se:mdh:diva-32465application/pdfinfo:eu-repo/semantics/openAccess
collection NDLTD
language Swedish
format Others
sources NDLTD
topic Lagerringar
Pressverktyg
Press-sekvens
Monteringsbana
Monteringslina
Lagerpress
spellingShingle Lagerringar
Pressverktyg
Press-sekvens
Monteringsbana
Monteringslina
Lagerpress
Jansson, Christoffer
Press-sekvens för lagerringar
description This report is the result of a thesis work in mechanichal engineering performed at Volvo GroupTrucks Operations, Powertrain productions in Köping by the student Christoffer Jansson. Thework of 15 ECTS credits is conducted over a 20 week period at half speed equivalent to 400working hours.The background to the work is the desire to improve a workstation where the transmissions tothe IPS2/3 and IPS15 are assembled. The problem on the workstation is that the workers areperforming non value-added activities (NVAA) and it is of interest that one would examine thepossibility of how to squeeze two bearing rings in the same sequence. The aim is thus todevelop a suggestion of improvement for the bearing pressing method on the assembly line.The issue the thesis work is based on is: How does one manage to press together two bearingrings in the same sequence into a particular component? & How can one improve theergonomic circumstances on the workstation?To be able to perform this work, a case study based on the product development processaccording to Ulrich and Eppinger (2012) has been made. Product development tools are used tofacilitate the work of the student. Including Gantt chart, Pugh's analysis and functional analysis.The result of the work is a modification of the existing working table where the bearing ringsare pressed into the middle gear housing. The solution consists of a steel plate that rests on fivesprings which dampen the weight of the middle gear housing. The middle gear housing is thecomponent in which the bearing rings are pressed in. There are 5 guiding rods that are mountedon the steel plate, one for each spring, which has the function to keep the steel plate stablewhen the middle gear housing is set on top. These guiding rods are in turn controlled bybushings which serve to reduce friction. The bushings are standard components that aremounted into a component called the bushing holder, which is a component that is screwed intothe table.The new working process the solution provides eliminates the previous NVAA that has been onthe station before and allows the worker to press two bearing rings into the middle gearinghouse in the same sequence. The ergonomic circumstances have also been improved due to theelimination of the worker having to rotate the heavy middle gearing house 180 degrees. Thesolution thus meets the demands made in the report and solves the problems identified.
author Jansson, Christoffer
author_facet Jansson, Christoffer
author_sort Jansson, Christoffer
title Press-sekvens för lagerringar
title_short Press-sekvens för lagerringar
title_full Press-sekvens för lagerringar
title_fullStr Press-sekvens för lagerringar
title_full_unstemmed Press-sekvens för lagerringar
title_sort press-sekvens för lagerringar
publisher Mälardalens högskola, Innovation och produktrealisering
publishDate 2016
url http://urn.kb.se/resolve?urn=urn:nbn:se:mdh:diva-32465
work_keys_str_mv AT janssonchristoffer presssekvensforlagerringar
_version_ 1718381176697126912